Showing 5521 to 5550 of 48748 results
[Construction of Extension Addition and Renovation of SHB at 66Kv S/S Benra Under P and M Division Barnala] [38/CCM/BTI/2024-25][2024_POWER_130426_1]
Department of Power||Punjab State Power Corporation Limited||CE - P and M||P and M Civil Construction and Mtc. - Bathinda
Last fetched | created on 2024-11-28 00:49:07
Start Date: 2024-11-27 09:00:00
End Date: 2024-12-24 05:00:00
Opening Date: 2024-12-30 11:30:00
Share
[Construction of Extension Addition and Renovation of SHB at 66Kv S/S Kuthala Under P and M Division Barnala] [39/CCM/BTI/2024-25][2024_POWER_130437_1]
Department of Power||Punjab State Power Corporation Limited||CE - P and M||P and M Civil Construction and Mtc. - Bathinda
Last fetched | created on 2024-11-28 00:48:59
Start Date: 2024-11-27 09:00:00
End Date: 2024-12-24 05:00:00
Opening Date: 2024-12-30 11:30:00
Share
[Laying of tower foundations,erection of towers, Stringing and sagging of conductor for Connecting proposed 132 KV S/S Batala Cooperative Sugar Mill With 132 KV Wadala Granthian-Kotli Surat Malhi Line (Deposit Work).] [13/TLSC/PTA/2024-25][2024_POWER_130501_1]
Department of Power||Punjab State Transmission Corporation Limited||TLSC Division - Patiala
Last fetched | created on 2024-11-28 00:48:48
Start Date: 2024-11-27 12:00:00
End Date: 2024-12-11 11:00:00
Opening Date: 2024-12-12 11:00:00
Share
[Design, manufacture, testing, supply and delivery of 220V/300Ah and 220V/200Ah battery chargers] [STQ-5172][2024_POWER_130511_1]
Department of Power||Punjab State Transmission Corporation Limited||AO/CPC (T) - Patiala
Last fetched | created on 2024-11-28 00:48:37
Start Date: 2024-11-27 02:00:00
End Date: 2025-01-01 11:00:00
Opening Date: 2025-01-03 11:00:00
Share
[Construction work of 1 No. line Bay and allied civil works at 66 KV S/S Apparel Park for M/S Ludhiana Steel Rolling Mills previously M/S Antartic Industries(Deposit Work)] [13/CWL/2024-25][2024_POWER_130386_1]
Department of Power||Punjab State Power Corporation Limited||Transmission Systems (TS)||Civil Works Division - Ludhiana
Last fetched | created on 2024-11-28 00:48:26
Start Date: 2024-11-27 05:00:00
End Date: 2024-12-30 05:00:00
Opening Date: 2025-01-02 03:30:00
Share
[Construction of Additional T/F Plinth and allied civil works at 66KV S/S Hazipur (under RDSS)] [08/CWL/2024-25][2024_POWER_130372_1]
Department of Power||Punjab State Power Corporation Limited||Transmission Systems (TS)||Civil Works Division - Ludhiana
Last fetched | created on 2024-11-28 00:48:18
Start Date: 2024-11-27 05:00:00
End Date: 2024-12-30 05:00:00
Opening Date: 2025-01-02 03:30:00
Share
[2nd CKt on the existing 66KV line from 66KV Garhshankar -66KV Dalewal Deposit work] [03/PT-540/TLCJAL/2024-25][2024_POWER_130036_2]
Department of Power||Punjab State Power Corporation Limited||Transmission Systems (TS)||TL Division - Jalandhar
Last fetched | created on 2024-11-28 00:48:09
Start Date: 2024-11-27 05:00:00
End Date: 2024-12-04 12:00:00
Opening Date: 2024-12-05 02:00:00
Share
[2nd Ckt of 66KV Jadla-Rahon line] [04/PT-541/TLCJAL/2024-25][2024_POWER_130042_2]
Department of Power||Punjab State Power Corporation Limited||Transmission Systems (TS)||TL Division - Jalandhar
Last fetched | created on 2024-11-28 00:47:59
Start Date: 2024-11-27 05:00:00
End Date: 2024-12-04 12:00:00
Opening Date: 2024-12-05 02:00:00
Share
[66KV Nawanshehar-Garhshankar 2nd ckt line] [06/PT-543/TLCJAL/2024-25][2024_POWER_130050_2]
Department of Power||Punjab State Power Corporation Limited||Transmission Systems (TS)||TL Division - Jalandhar
Last fetched | created on 2024-11-28 00:47:39
Start Date: 2024-11-27 05:00:00
End Date: 2024-12-04 12:00:00
Opening Date: 2024-12-05 02:00:00
Share
[Construction of 66 KV line from Nawan Pind to 66 KV S/S Focal Point, Mehta Road, Vallah (Amritsar) SC on DC Towers] [02/PT-539/TLCJAL/2024-25][2024_POWER_129999_2]
Department of Power||Punjab State Power Corporation Limited||Transmission Systems (TS)||TL Division - Jalandhar
Last fetched | created on 2024-11-28 00:47:29
Start Date: 2024-11-27 05:00:00
End Date: 2024-12-04 12:00:00
Opening Date: 2024-12-05 02:00:00
Share
[132KV S/S Gurdaspur-66KV Gahlari T-off line for new 66KV S/S Chakk Arayian] [07/PT-544/TLCJAL/2024-25][2024_POWER_130051_2]
Department of Power||Punjab State Power Corporation Limited||Transmission Systems (TS)||TL Division - Jalandhar
Last fetched | created on 2024-11-28 00:47:19
Start Date: 2024-11-27 05:00:00
End Date: 2024-12-04 12:00:00
Opening Date: 2024-12-05 02:00:00
Share
[To place an yearly running contract for providing 06 No drivers possessing heavy vehicle driving license for operation of fire tenders (round the clock in four 03 shifts and general shift) for fire fighting services at GGSSTP] [582/P-1/EMPW-12808 dtd 27.11.24][2024_POWER_130503_1]
Department of Power||Punjab State Power Corporation Limited||GGSSTP, Roopnagar||P-1
Last fetched | created on 2024-11-28 00:47:11
Start Date: 2024-11-27 05:05:00
End Date: 2024-12-11 11:00:00
Opening Date: 2024-12-12 11:30:00
Share
MIDWAY SERVICE PLAZA AND MOTEL AT ASANPUR KUPHA, BIHAR (PHASE- 1 MAIN BUILDING).
Bihar State Tourism Development Corporation
Last fetched | created on 2024-11-28 00:46:53
Start Date: 2024-11-27 20:00:00
End Date: 2024-12-04 15:00:00
Opening Date: 2024-12-05 15:30:00
Share
Procurement of 48 KW Heating Chamber of size 9' (depth)X8' (width)X 10' (height), filled with glass wool, fitted with trolley, panel with double protection and digital temperature controller etc (for Power Transformer)
South Bihar Power Distribution Company Limited
Last fetched | created on 2024-11-25 17:17:53
Start Date: 2024-11-25 10:00:00
End Date: 2024-12-03 18:00:00
Opening Date: 2024-12-04 17:00:00
Share
Equipment's for Electronics Engineering Lab
Department of Science and Technology
Last fetched | created on 2024-11-25 17:17:41
Start Date: 2024-11-11 10:00:00
End Date: 2024-12-03 17:00:00
Opening Date: 2024-12-05 11:00:00
Share
[Construction work of CC road and slab from Billu Rajauliya house to Rakesh Mishra house in ward no. 27 Katra Sahab khan.] [565/JNV/E-NIVIDA such/2024-25 date 18.11.2024][2024_DOLBU_975046_58]
Directorate of Local Bodies UP||Nagar Palika Parishad Etawah Etawah
Last fetched | created on 2024-11-28 00:36:52
Start Date: 2024-11-22 09:00:00
End Date: 2024-12-12 01:00:00
Opening Date: 2024-12-12 03:00:00
Share
[Ward 10 mohalla Kasupet me Rambeti Digree College se Radhey bade ke bag tak CC raod nirman karya] [1030/NPPB/ENS/24-25/10][2024_DOLBU_976068_1]
Directorate of Local Bodies UP||Nagar Palika Parishad Bilgram Hardoi
Last fetched | created on 2024-11-28 00:36:35
Start Date: 2024-11-22 09:00:00
End Date: 2024-12-02 05:00:00
Opening Date: 2024-12-03 01:00:00
Share
Equipment's for Mechanical Engineering Department.
Department of Science and Technology
Last fetched | created on 2024-11-25 15:31:44
Start Date: 2024-11-15 10:00:00
End Date: 2024-12-02 23:00:00
Opening Date: 2024-12-03 11:00:00
Share
[Foundation and soil filling work for building a hall on the trenching ground near Pakka Bagh Tiraha.] [565/JNV/E-NIVIDA such/2024-25 date 18.11.2024][2024_DOLBU_975046_74]
Directorate of Local Bodies UP||Nagar Palika Parishad Etawah Etawah
Last fetched | created on 2024-11-28 00:07:16
Start Date: 2024-11-22 11:00:00
End Date: 2024-12-12 01:00:00
Opening Date: 2024-12-12 03:00:00
Share
[Construction of Downstream Infrastructure of Mizoram Transmission System under Revamped Reforms-based and Results-linked Distribution Sector Scheme (RDSS)] [T.38011/1/2024-EinC(P)/W-II/6][2024_POWER_445_1]
Power and Electricity Department||Engineer-in-Chief - POWER||Chief Engineer-RE - POWER||Superintending Engineer-RE - POWER
Last fetched | updated on 2024-11-30 00:00:41
Start Date: 2024-11-13 04:00:00
End Date: 2024-12-02 04:00:00
Opening Date: 2024-12-03 01:00:00
Share
[Electrification of Households in 29 villages in the state of M] [T.36011/1/2024- EinC(P)/W-II/32][2024_POWER_446_1]
Power and Electricity Department||Engineer-in-Chief - POWER||Chief Engineer-RE - POWER||Superintending Engineer-RE - POWER
Last fetched | updated on 2024-11-30 00:00:33
Start Date: 2024-11-14 09:00:00
End Date: 2024-12-03 04:00:00
Opening Date: 2024-12-04 01:00:00
Share
[WORK NO 5] [387][2024_DOLBU_975958_6]
Directorate of Local Bodies UP||Nagar Panchayat Parsupur Gonda
Last fetched | created on 2024-11-27 23:56:19
Start Date: 2024-11-22 12:00:00
End Date: 2024-12-02 06:00:00
Opening Date: 2024-12-03 12:00:00
Share
[Dharamkheri, Hansi2, Const. of IPB Street Rammehar Malik to Hari Sharma (D Plan)] [202441479A8F 1F33 4E5B 8457 BA3CABA34BEF699DEV][2024_HRY_412854_1]
Haryana Government||Panchayati Raj Haryana||XEN Panchayati Raj Hisar
Last fetched | created on 2024-11-27 23:46:33
Start Date: 2024-11-25 09:00:00
End Date: 2024-12-02 01:00:00
Opening Date: 2024-12-02 03:00:00
Share
[Under Avasthapna Vikas- Ward No.-04 me Durga Chakki Vishnu Pal Sharma, Chhanni Jatav, Pawan Mavai ke makan wali gali v CC dwara sudhaar karya.] [2054/Nirman/NPPD/2024-25 Dt 18-11-2024][2024_DOLBU_976260_1]
Directorate of Local Bodies UP||Nagar Palika Parishad Dadri Gautam Budha Nagar
Last fetched | created on 2024-11-27 23:44:07
Start Date: 2024-11-22 01:00:00
End Date: 2024-12-09 04:00:00
Opening Date: 2024-12-09 05:00:00
Share
[Ugalan, Hansi2, Const. of Singhmar Choupal (D Plan)] [2024895EFD69 5493 4E92 B29A F75205443D0E699DEV][2024_HRY_412870_1]
Haryana Government||Panchayati Raj Haryana||XEN Panchayati Raj Hisar
Last fetched | created on 2024-11-27 23:43:14
Start Date: 2024-11-25 09:00:00
End Date: 2024-12-02 01:00:00
Opening Date: 2024-12-02 03:00:00
Share
[Construction of IPB Street ...] [20241A004B1D E2A6 4ED2 8221 B853B3703241295ULB][2024_HRY_413122_1]
Haryana Government||Urban Local Bodies||MC Rewari
Last fetched | created on 2024-11-27 23:34:41
Start Date: 2024-11-25 10:00:00
End Date: 2024-12-03 05:00:00
Opening Date: 2024-12-04 11:00:00
Share
[Work like shed and electrification etc. to build a hall on the trenching ground near Pakka Bagh intersection.] [565/JNV/E-NIVIDA such/2024-25 date 18.11.2024][2024_DOLBU_975046_77]
Directorate of Local Bodies UP||Nagar Palika Parishad Etawah Etawah
Last fetched | created on 2024-11-27 23:27:21
Start Date: 2024-11-22 02:00:00
End Date: 2024-12-12 01:00:00
Opening Date: 2024-12-12 03:00:00
Share
[Construction work of Deep Drain from Yamuna action Plan Boundary to Hanuman Ghat.] [565/JNV/E-NIVIDA such/2024-25 date 18.11.2024][2024_DOLBU_975046_86]
Directorate of Local Bodies UP||Nagar Palika Parishad Etawah Etawah
Last fetched | created on 2024-11-27 23:26:43
Start Date: 2024-11-22 02:00:00
End Date: 2024-12-12 01:00:00
Opening Date: 2024-12-12 03:00:00
Share
[Dnit for the work A Mtc water supply scheme Balali. commissioning of 1 no. tube well] [EE Amount Rs. 7.42][2024_HRY_413260_1]
Haryana Government||Engineer- in- Chief PHED Panchkula||Bhiwani Circle||Charkhi Dadri PHED
Last fetched | created on 2024-11-27 23:17:20
Start Date: 2024-11-25 03:00:00
End Date: 2024-12-02 12:00:00
Opening Date: 2024-12-02 12:00:00
Share
[Nagar Panchayat chhitauni ke bulahawa mein uchch prathmik vidyalay mein divyang shauchalay Nirman karya] [645(2)][2024_DOLBU_975875_5]
Directorate of Local Bodies UP||Nagar Panchayat Chitouni Kushinagar
Last fetched | created on 2024-11-27 23:16:37
Start Date: 2024-11-22 03:00:00
End Date: 2024-12-06 03:00:00
Opening Date: 2024-12-06 04:30:00
Share