Showing 58141 to 58170 of 59581 results
[Construction of 4 Lane PS from Km 140.200 to 167.326 Chikkodi Gotur section including Chikkodi Bypass on NH 548B in the State of Karnataka on Hybrid Annuity Mode HAM under NHO Annual Plan 2023 24] [RW/BNG/NH-373/Km105. 780-128.080/27/2024][2024_MoRTH_813694_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Bangalore - MoRTH
Last fetched | updated on 2024-11-26 16:27:29
Start Date: 2024-06-26 05:00:00
End Date: 2024-12-12 03:00:00
Opening Date: 2024-12-13 03:00:00
Share
[Widening Re Construction to Four Lane from Km 0.000 to Km 15.870 Near Miriyan Telangana Karnataka Border Chincholi Section of NH 167N in Kalaburagi District in the State of Karnataka on HAM under Annual Plan 2023 24 ] [RW/BNG/NH-167N/ Km0-15.850/03/2023][2024_MoRTH_813722_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Bangalore - MoRTH
Last fetched | updated on 2024-11-26 16:27:18
Start Date: 2024-06-26 06:00:00
End Date: 2024-12-23 03:00:00
Opening Date: 2024-12-24 03:00:00
Share
[RFP FOR Construction of 4 lane Jaunpur Bypass from km 80.220 to km 107.780 of NH 135A Pkg I (Jaunpur Akbarpur Section) in the State of Uttar Pradesh on HAM Mode.] [CE-RO/LKO/NH-135A/PKG I/2023-24 Dated. 04.07.2024][2024_MoRTH_814994_1]
Ministry of Road Transport and Highways||P2 Delhi - MoRTH||RO Lucknow - MoRTH
Last fetched | updated on 2024-11-26 16:27:03
Start Date: 2024-07-04 06:55:00
End Date: 2024-12-05 11:00:00
Opening Date: 2024-12-06 11:30:00
Share
[Consultancy Services for Preparation of Detailed Project Report (DPR) for (1).Construction of 4L ROB at Km 33.100 and Km 35.660 (2) 4L Major Bridge at Km 32.000 (3). Upgradation to 4 Lane from Km 45.400 to Km 46.200 on NH-330B in the State of UP.] [CE-RO/LKO/DPR/NH-330B/2024-25 Date.10.07.2024][2024_MoRTH_815941_1]
Ministry of Road Transport and Highways||P2 Delhi - MoRTH||RO Lucknow - MoRTH
Last fetched | updated on 2024-11-26 16:26:48
Start Date: 2024-07-10 06:55:00
End Date: 2024-12-11 11:00:00
Opening Date: 2024-12-12 12:00:00
Share
[Remedial measures of existing bridge on river Bharaj between KM 409/305 to Km 409/705 on NH 56 in district Chhotaudepur in the state of Gujarat] [EPC 01 of 2024-25][2024_MoRTH_816495_1]
Ministry of Road Transport and Highways||P4 Delhi - MoRTH||RO Gandhinagar - MoRTH||NH Division-Varodara - MoRTH
Last fetched | updated on 2024-11-26 16:26:39
Start Date: 2024-07-15 09:00:00
End Date: 2024-12-03 11:00:00
Opening Date: 2024-12-04 03:00:00
Share
[Balance Work of Rehabilitation and up-gradation of NH-66 from design km. 84.000 to km. 110.750 (Indapur-Wadpale) to 4LPS in the state of Maharashtra under NHDP-IV on EPC mode. ] [RO/MUM/TENDER/2025-25/01][2024_MoRTH_817331_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH
Last fetched | updated on 2024-11-26 16:26:30
Start Date: 2024-07-19 06:55:00
End Date: 2024-12-04 05:00:00
Opening Date: 2024-12-05 11:00:00
Share
[Short Term Maintenance Work From Km. 5th(P) to Km. 37th (P) of NH-133 E for the Year 2024-25 ] [NH/BHAGALPUR,STMC/07/2024-25][2024_MoRTH_820379_1]
Ministry of Road Transport and Highways||P3 Delhi - MoRTH||RO Patna - MoRTH||NH Division-Bhagalpur - MoRTH
Last fetched | updated on 2024-11-26 16:26:20
Start Date: 2024-08-07 04:15:00
End Date: 2024-12-17 03:00:00
Opening Date: 2024-12-18 04:00:00
Share
[Construction of 2 Lane ROB over L.C. No 2 between Muktapur and Kishanpur station on Samastipur Darbhanga Road (NH 322) in Samastipur district in the state of Bihar on EPC mode.] [03/NH/Samastipur/EPC/2024-25][2024_MoRTH_821965_1]
Ministry of Road Transport and Highways||P3 Delhi - MoRTH||RO Patna - MoRTH||NH Division- Samastipur - MoRTH
Last fetched | updated on 2024-11-26 16:26:02
Start Date: 2024-08-20 03:00:00
End Date: 2024-12-18 03:00:00
Opening Date: 2024-12-20 11:00:00
Share
[PREPARATION OF DETAILED PROJECT REPORT FOR UP-GRADATION OF KATGHORA TO AMBIKAPUR SECTION ON NH-130 TO FOUR LANE WITH PAVED SHOULDER CONFIGURATION IN THE STATE OF CHHATTISGARH] [RO/2024/11][2024_MoRTH_821985_1]
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH
Last fetched | updated on 2024-11-26 16:25:53
Start Date: 2024-08-20 05:30:00
End Date: 2024-12-16 11:00:00
Opening Date: 2024-12-17 11:00:00
Share
[Strengthening, Upgradation and Widening of Nandur Shigote Kolhar Section of NH-160D km. 00.00 to 47.370 Nandur Shingote Kolar Section Total Length 47.37 km. 2L. PS Configuration in the State of Maharashtra on EPC Mode. ] [NIT 01][2024_MoRTH_823657_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Pune - MoRTH
Last fetched | updated on 2024-11-26 16:25:42
Start Date: 2024-08-30 05:00:00
End Date: 2024-12-04 05:30:00
Opening Date: 2024-12-06 11:00:00
Share
[Consultancy Services for Preparation of Detailed Project Report including LA and other clearances forConstruction of Pipra Bazar Bypass at Km 44 on NH-106 (New NH-131) in the State of Bihar] [04/DPR/NH-MADHEPURA/2024-25][2024_MoRTH_824048_1]
Ministry of Road Transport and Highways||P3 Delhi - MoRTH||RO Patna - MoRTH||NH Division-Madhepura - MoRTH
Last fetched | updated on 2024-11-26 16:25:16
Start Date: 2024-09-03 09:00:00
End Date: 2024-12-03 04:00:00
Opening Date: 2024-12-04 04:30:00
Share
[Construction of New Bridge on river Bharaj at KM 409/305 to Km 409/705 on NH 56 in district Chhotaudepur in the state of Gujarat.] [EPC 02 of 2024-25][2024_MoRTH_824409_1]
Ministry of Road Transport and Highways||P4 Delhi - MoRTH||RO Gandhinagar - MoRTH||NH Division-Varodara - MoRTH
Last fetched | updated on 2024-11-26 16:25:06
Start Date: 2024-09-04 02:00:00
End Date: 2024-12-02 11:00:00
Opening Date: 2024-12-03 03:00:00
Share
[Design and Construction of Underground Stations at Market Yard, Padmavati, Katraj and] [P1A-UGC/2024 (ICB)][2024_MMRCL_1106664_1]
Maharashtra Metro Rail Corporation Limited||Pune Metro Rail Project
Last fetched | updated on 2024-11-06 10:48:37
Start Date: 2024-10-07 02:00:00
End Date: 2024-12-03 04:00:00
Opening Date: 2024-12-04 04:30:00
Share
[Construction of Breakwater, Ro-Ro Jetty and Allied facilities at Revdanda Tal. Alibag Dist. Raigad.] [MMB/2024-25/Reg.1/B2/35][2024_MMB_1087607_1]
Maharashtra Maritime Board Mumbai
Last fetched | updated on 2024-11-06 10:41:53
Start Date: 2024-09-19 03:20:00
End Date: 2024-12-02 05:00:00
Opening Date: 2024-12-04 12:00:00
Share
[Construction of Groynes Bund, Jetty, Approach road and Dredging of existing Channel at Akshi Sakhar Tal. Alibag Dist. Raigad] [MMB/2024-25/Reg.1/B1/48][2024_MMB_1095675_1]
Maharashtra Maritime Board Mumbai
Last fetched | updated on 2024-11-06 10:41:38
Start Date: 2024-09-27 03:00:00
End Date: 2024-12-02 05:00:00
Opening Date: 2024-12-04 12:00:00
Share
[ANNUAL RATE CONTRACT FOR UPLIFTING AND PLATEFORM REPAIRING OF HANDPUMP UNDER DIVISION MALPURA] [SE PHED NIT No. 16/2024-25][2024_PHCJA_427384_1]
PHED-Chief Engineer(HQ),Jaipur||ACE Region Ajmer||SE Cr. Ajmer
Last fetched | updated on 2024-11-25 13:32:15
Start Date: 2024-10-14 06:00:00
End Date: 2024-12-19 06:00:00
Opening Date: 2024-12-20 11:00:00
Share
[ANNUAL RATE CONTRACT FOR DEEPENING AND FLUSHING OF TUBEWELL AND HANDPUMP UNDER DIVISION MALPURA] [SE PHED NIT No. 15/2024-25][2024_PHCJA_427357_1]
PHED-Chief Engineer(HQ),Jaipur||ACE Region Ajmer||SE Cr. Ajmer
Last fetched | updated on 2024-11-25 13:32:23
Start Date: 2024-10-14 06:00:00
End Date: 2024-12-19 06:00:00
Opening Date: 2024-12-20 11:00:00
Share
[Maintenance Contract on Daboh-Bhander-Chirgaon Length 45.63 km on NH-552 Ext. in the state of Madhya Pradesh on Performance Based Maintenance Contract (PBMC) mode] [04/SAC/TENDER/NH/GWL/2024-25][2024_MoRTH_829454_1]
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhopal - MoRTH||NH Madhya Pradesh PWD-NH-Section-BHOPAL - MoRTH
Last fetched | updated on 2024-11-26 16:18:46
Start Date: 2024-10-07 10:30:00
End Date: 2024-12-02 05:30:00
Opening Date: 2024-12-04 12:30:00
Share
[Maintenance of Bhokardan Hasnabad Jawkheda Rajur Deulgaonraja section of NH753 M from Km. 0 000 Kumbhari Phata to 63 900 Dulgaonraja and Extension from 17 900 Jawkheda Phata to 20 730 Talegaon Phata Total 62 153 Km 2L PS 4L configuration road in the ] [EENHD/Chh.S./Tender/NIT No-8/3002199A][2024_MoRTH_829912_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Aurangabad - MoRTH
Last fetched | updated on 2024-11-24 15:20:45
Start Date: 2024-10-11 04:00:00
End Date: 2024-12-04 05:30:00
Opening Date: 2024-12-05 12:00:00
Share
[Authority Engineer Services for The Consultancy and Supervision of Strengthening, Upgradation and Widening of Nandur Shingote - Kolhar Section in the State of Maharashtra on EPC Mode] [NIT-06/EENH/NASHIK/4629][2024_MoRTH_830490_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Pune - MoRTH
Last fetched | updated on 2024-11-26 16:05:59
Start Date: 2024-10-11 06:55:00
End Date: 2024-12-04 05:30:00
Opening Date: 2024-12-06 11:00:00
Share
[Road Safety work of black spots on NH 752 H Km 32 000 Rotegaon ROB in the state of Maharashtra.] [EENHD/Chh.S/Tender/NIt No-10/3002266][2024_MoRTH_830508_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Aurangabad - MoRTH
Last fetched | updated on 2024-11-26 16:04:43
Start Date: 2024-10-12 09:00:00
End Date: 2024-12-09 05:30:00
Opening Date: 2024-12-10 12:00:00
Share
[Consultancy services for Preparation of DPR and Preconstruction Activity and Forest Diversion for Rehabilitation and Upgradation of existing highway to Two lane Paved Shoulder configuration of Wardha Arvi NH 647 in forest section km 24/060 to 26/010] [NIT-20/EENH/NGP/2024-25][2024_MoRTH_830561_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nagpur - MoRTH
Last fetched | updated on 2024-11-26 15:59:55
Start Date: 2024-10-14 09:00:00
End Date: 2024-12-16 05:00:00
Opening Date: 2024-12-18 05:05:00
Share
[Performance based Maintenance Contracts (PBMC) Estimate of Khamgaon Shegaon section of NH548C (Design km.0.000 to km 22.800) Two Four Lane with Paved shoulders Configuration in the state of Maharashtra for 5 year Maintenance Period.] [16/EENH/AKL/2024-25, Dt.11/10/2024][2024_MoRTH_830555_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Akola - MoRTH
Last fetched | updated on 2024-11-26 15:58:58
Start Date: 2024-10-14 09:00:00
End Date: 2024-12-10 05:30:00
Opening Date: 2024-12-12 05:30:00
Share
[Performance based Maintenance Contracts (PBMC) Estimate of Deulgaon Sakarsha Mehkar section of NH 548C (Design Km 35.786 to 37.200 42.500 to 66.256 68.056 to 71.786) Two Lane with Paved shoulders Configuration in the state of Maharashtra for 5 year] [18/EENH/AKL/2024-25 Dt.11/10/2024][2024_MoRTH_830557_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Akola - MoRTH
Last fetched | updated on 2024-11-26 15:58:35
Start Date: 2024-10-14 09:00:00
End Date: 2024-12-20 05:30:00
Opening Date: 2024-12-23 12:00:00
Share
[Performance based Maintenance Contracts (PBMC) Estimate of Khamgaon Deulgaon Sakarsha section of NH 548C (Design km.0.000 to km 28.300 and km 32.100 to km 32.700) Two Lane with Paved shoulders Configuration in the state of Maharashtra for 5 year Main] [17/EENH/AKL/2024-25 Dt.11/10/2024][2024_MoRTH_830556_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Akola - MoRTH
Last fetched | updated on 2024-11-26 16:00:04
Start Date: 2024-10-14 09:00:00
End Date: 2024-12-20 05:30:00
Opening Date: 2024-12-23 12:00:00
Share
[Consultancy Services for Prepartion of Detailed Project Report and Feasibillity study ] [NIT-22/EENH/NGP/2024-25][2024_MoRTH_830564_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nagpur - MoRTH
Last fetched | updated on 2024-11-23 14:33:49
Start Date: 2024-10-14 09:00:00
End Date: 2024-12-16 05:00:00
Opening Date: 2024-12-18 05:05:00
Share
[Cost estimate of Preconstruction Activities for Upgradation of Pulgaon to Arvi Section of NH 347A from Km 26/500 to Km 59/900 Design Chainage Km 0/000 to Km 33/400 Excluding Samrudhhi Expressway Length from Km 30/000 to 33/000 3.00 Km to Two Laning] [NIT-21/EENH/NGP/2024-25][2024_MoRTH_830563_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nagpur - MoRTH
Last fetched | updated on 2024-11-23 14:34:05
Start Date: 2024-10-14 09:00:00
End Date: 2024-12-16 05:00:00
Opening Date: 2024-12-18 05:05:00
Share
[Consultancy Services for Preparation of Detailed Project Report and Feasibility study for Construction of 2 lane with Paved Shoulder ,Animal Underpasses (6 Nos) and ROB (01No.) on Nilajphata - Pauni- Adyal- Bhandara road on NH-247 as a Wildlife Mitig] [NIT-23/EENH/NGP/2024-25][2024_MoRTH_830567_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nagpur - MoRTH
Last fetched | updated on 2024-11-26 16:00:52
Start Date: 2024-10-14 09:00:00
End Date: 2024-12-16 05:00:00
Opening Date: 2024-12-18 05:05:00
Share
[Balance work of Up-Gradation of Amgaon-Gondia National Highway 543 in Km 24/985 to 27/025 32/130 to 34/088 and 39/475 to 41/625 Design Km 54/840 to 52/800 47/695 to 45/737 and 40/350 to 38/200 Construction Length 6.148 Km to Two Lane with Paved Shou] [NIT-18/EENH/NGP/2024-25][2024_MoRTH_830558_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nagpur - MoRTH
Last fetched | updated on 2024-11-23 14:34:13
Start Date: 2024-10-14 09:00:00
End Date: 2024-12-24 05:00:00
Opening Date: 2024-12-30 05:05:00
Share
[Short Term Maintenance Contract (STMC) for maintenance of NH 753 in Amdi to Saoner section in Km 226/140 to 226/280 Km 231/600 to 232/540 Km 256/245 to 256/800 and Km 264/800 to 265/724. (Total Length 2.560 Km) in Nagpur District in the state of Ma] [NIT-25/EENH/NGP/2024-25][2024_MoRTH_830634_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nagpur - MoRTH
Last fetched | updated on 2024-11-26 15:58:17
Start Date: 2024-10-14 02:30:00
End Date: 2024-12-05 05:00:00
Opening Date: 2024-12-09 05:05:00
Share