Showing 60691 to 60720 of 62053 results
[Cost estimate of Preconstruction Activities for Upgradation of Pulgaon to Arvi Section of NH 347A from Km 26/500 to Km 59/900 Design Chainage Km 0/000 to Km 33/400 Excluding Samrudhhi Expressway Length from Km 30/000 to 33/000 3.00 Km to Two Laning] [NIT-21/EENH/NGP/2024-25][2024_MoRTH_830563_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nagpur - MoRTH
Last fetched | updated on 2024-11-23 14:34:05
Start Date: 2024-10-14 09:00:00
End Date: 2024-12-16 05:00:00
Opening Date: 2024-12-18 05:05:00
Share
[Consultancy Services for Preparation of Detailed Project Report and Feasibility study for Construction of 2 lane with Paved Shoulder ,Animal Underpasses (6 Nos) and ROB (01No.) on Nilajphata - Pauni- Adyal- Bhandara road on NH-247 as a Wildlife Mitig] [NIT-23/EENH/NGP/2024-25][2024_MoRTH_830567_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nagpur - MoRTH
Last fetched | updated on 2024-11-23 14:34:36
Start Date: 2024-10-14 09:00:00
End Date: 2024-12-16 05:00:00
Opening Date: 2024-12-18 05:05:00
Share
[Balance work of Up-Gradation of Amgaon-Gondia National Highway 543 in Km 24/985 to 27/025 32/130 to 34/088 and 39/475 to 41/625 Design Km 54/840 to 52/800 47/695 to 45/737 and 40/350 to 38/200 Construction Length 6.148 Km to Two Lane with Paved Shou] [NIT-18/EENH/NGP/2024-25][2024_MoRTH_830558_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nagpur - MoRTH
Last fetched | updated on 2024-11-23 14:34:13
Start Date: 2024-10-14 09:00:00
End Date: 2024-12-24 05:00:00
Opening Date: 2024-12-30 05:05:00
Share
[Short Term Maintenance Contract (STMC) for maintenance of NH 753 in Amdi to Saoner section in Km 226/140 to 226/280 Km 231/600 to 232/540 Km 256/245 to 256/800 and Km 264/800 to 265/724. (Total Length 2.560 Km) in Nagpur District in the state of Ma] [NIT-25/EENH/NGP/2024-25][2024_MoRTH_830634_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nagpur - MoRTH
Last fetched | updated on 2024-11-24 15:13:10
Start Date: 2024-10-14 02:30:00
End Date: 2024-12-05 05:00:00
Opening Date: 2024-12-09 05:05:00
Share
[Widening to 4 lane with road side drain in Udaynagar village and construction of 2LPS from section 94.600 to 65.100 on chikhali khamgaon NH548CC in the state of Maharashtra on EPC mode. ] [21/EENH/AKL/2024-25 Dt.11/10/2024][2024_MoRTH_830621_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Akola - MoRTH
Last fetched | updated on 2024-11-24 15:12:54
Start Date: 2024-10-14 02:50:00
End Date: 2024-12-10 05:30:00
Opening Date: 2024-12-12 05:30:00
Share
[Short Term Maintenance Contract (STMC) for Maintenance of NH247 in Kamptee to Gumthala section in Km 19/200 to 25/900 and Km 27/600 to 32/000 of Dahegaon - Kuhi Road (Total Length 11.100 Km) in Nagpur District in the state of Maharashtra] [NIT-25/EENH/NGP/2024-25][2024_MoRTH_830637_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nagpur - MoRTH
Last fetched | updated on 2024-11-24 15:12:37
Start Date: 2024-10-14 03:00:00
End Date: 2024-12-05 05:00:00
Opening Date: 2024-12-09 05:05:00
Share
[Performance based Maintenance Contracts (PBMC) Estimate of Four Laning of Jalgaon Jamod Nandura section of NH161H (Design Km.0.00 to km.24.998) to two lane with paved shoulders configuration of NH161H in the state of Maharashtra for 5 year Mai] [22/EENH/AKL/2024-25 Dt.11/10/2024][2024_MoRTH_830650_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Akola - MoRTH
Last fetched | updated on 2024-11-24 15:12:20
Start Date: 2024-10-14 04:00:00
End Date: 2024-12-20 05:30:00
Opening Date: 2024-12-23 12:00:00
Share
[Construction of 4 lane concrete White topping Nagbhid city portion ] [NIT-27/EENH/NGP/2024-25][2024_MoRTH_830674_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nagpur - MoRTH
Last fetched | updated on 2024-11-24 15:12:09
Start Date: 2024-10-14 04:15:00
End Date: 2024-12-24 05:00:00
Opening Date: 2024-12-30 05:05:00
Share
[Consrtuction of Boxculvert at Ch.84/200 on Deori to Korchi Road Section from Km 80/025 to 124/965 on Balaghat- Gondia-Amgaon-Deori-Korchi Road NH 543 tahsil Deori ,District Gondia in the State of Maharashtra] [NIT-24/EENH/NGP/2024-25][2024_MoRTH_830570_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nagpur - MoRTH
Last fetched | updated on 2024-11-24 15:11:52
Start Date: 2024-10-14 04:30:00
End Date: 2024-12-05 05:00:00
Opening Date: 2024-12-09 05:05:00
Share
[Cost estimate of Preconstruction Activities for Upgradation of Nagpur-Nagbhir-Brahmapuri Armori Section of NH 353 D to 2/ 4 lane in the State of Maharashtra. PKG II, Umred Nagbhir From KM 48/000 to KM 96/700) Pkg 2 in the state of Maharashtra with] [NIT-28/EENH/NGP/2024-25][2024_MoRTH_830692_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nagpur - MoRTH
Last fetched | updated on 2024-11-24 15:11:32
Start Date: 2024-10-14 04:45:00
End Date: 2024-12-16 05:00:00
Opening Date: 2024-12-18 05:05:00
Share
[Performance based Maintenance Contracts (PBMC) Estimate of Rehabilitation and upgradation of Akot Anjangaon section of NH 548C (Ch.51.290 to 84.800) to Two.Four Lane with Paved shoulders Configuration of NH548C in the state of Maharashtra for 5 yea] [23/EENH/AKL/2024-25 Dt.11/10/2024][2024_MoRTH_830696_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Akola - MoRTH
Last fetched | updated on 2024-11-24 15:11:23
Start Date: 2024-10-14 05:30:00
End Date: 2024-12-20 05:30:00
Opening Date: 2024-12-23 12:00:00
Share
[Performance based Maintenance Contracts (PBMC) Estimate of Anjangaon Mp Border section of NH548C (Design km.84.800 to km 126.205) Two.Four Lane with Paved shoulders Configuration in the state of Maharashtra for 5 year Maintenance Period] [24/EENH/AKL/2024-25 Dt.11/10/2024][2024_MoRTH_830711_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Akola - MoRTH
Last fetched | updated on 2024-11-24 15:11:13
Start Date: 2024-10-14 05:55:00
End Date: 2024-12-20 05:30:00
Opening Date: 2024-12-23 12:00:00
Share
[Consultancy services for Authoritys Engineer for Supervision of Construction of Animal Underpasses at Nagbhid - Bramhapuri - Armori Road NH -353D in Km 109/650 and 111/175 In State Of Maharashtra On EPC Mode.] [NIT-29/EENH/NGP/2024-25][2024_MoRTH_830721_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nagpur - MoRTH
Last fetched | updated on 2024-11-24 15:10:52
Start Date: 2024-10-14 06:00:00
End Date: 2024-12-16 05:00:00
Opening Date: 2024-12-18 05:05:00
Share
[Consultancy Services for Authoritys Engineer for superv.of Impro.and Upgrada.from Km.73.300 Km (Bikapur)to Km.140.960 (Patranga)(Design length 67.660 Km (84 Kosi Parikrama Marg)) to 2Lane with P.S.configu. under EPC mode in the State of U.P.] [CE-RO/LKO/NH(O)/07/NH-227B (Pkg-IV)/2022-23/AE Dt 14.10.2024][2024_MoRTH_830443_1]
Ministry of Road Transport and Highways||P2 Delhi - MoRTH||RO Lucknow - MoRTH
Last fetched | updated on 2024-11-24 15:11:02
Start Date: 2024-10-14 06:00:00
End Date: 2024-12-30 11:00:00
Opening Date: 2024-12-31 12:30:00
Share
[Performance Based Maintenance Contract PBMC to Watul . Talgaon New NH No .66 from existing km 332.200 to km 367.200 Design Km 165.270 to km 198.528 In the state of Maharashtra for 7 year Maintenance period] [Bid/Package no/EENH/Ratnagiri/AB/TC / 2670 ][2024_MoRTH_830724_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Ratnagiri - MoRTH
Last fetched | updated on 2024-11-24 15:10:35
Start Date: 2024-10-14 06:15:00
End Date: 2024-11-27 05:30:00
Opening Date: 2024-11-28 05:30:00
Share
[Strengthening work on Wajawana - Banswara section at Design ch. 242.000 to 243.350, 244.500 to 248.170, 251.880 to 255.330 including Black spot rectification at 256.742 on NH-927A in the State of Rajasthan on EPC mode] [NIT 11/2024-25 CE NH Jaipur][2024_MoRTH_830735_1]
Ministry of Road Transport and Highways||P4 Delhi - MoRTH||RO Jaipur - MoRTH||National Highway Rajasthan PWD-Udaipur - MoRTH
Last fetched | updated on 2024-11-24 15:10:26
Start Date: 2024-10-15 09:00:00
End Date: 2024-12-04 11:00:00
Opening Date: 2024-12-06 11:00:00
Share
[Performance Based Maintenance Contract PBMC work on Tembhurni Pandharpur section Km. 0.00 to 36.190 Length 36.190 Km PartA and Km. 42.500 to 60.00 and 64.500 to 95.136 Length 48.136 Km.Part B section of NH 561A and Kurduwadi Pandharpur Sangola r] [NHD/EE/TENDER/PBMC/2757/2024 ][2024_MoRTH_830751_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-SOLAPUR - MoRTH
Last fetched | updated on 2024-11-24 15:09:50
Start Date: 2024-10-15 09:00:00
End Date: 2024-12-04 05:30:00
Opening Date: 2024-12-06 03:00:00
Share
[CONSTRUCTION OF GRADE SEPARATED STRUCTURE VUP ON AJMER NAGAUR SECTION OF NH 89 (NEW NH-58) AT KM 3/630 (KAYAD), KM 6/020 (SIKAR JUNCTION) AND AT KM 18/500 (DEV NAGAR) IN THE STATE OF RAJASTHAN] [NIT 02/2024-25 CE (NH, PPP) PWD Rajasthan, Jaipur][2024_MoRTH_830750_1]
Ministry of Road Transport and Highways||P4 Delhi - MoRTH||RO Jaipur - MoRTH||National Highway Rajasthan PWD-Jaipur - MoRTH
Last fetched | updated on 2024-11-24 15:10:17
Start Date: 2024-10-15 09:00:00
End Date: 2024-11-27 11:00:00
Opening Date: 2024-11-28 11:00:00
Share
[Balance work of Rehabilitation and Up-gradation of Vita to Nagaj section of NH-166 E from Design Km 47/500 to km 94/155 (Km 48/950 to 50/270, 51/270 to 52/100, 53/800 to 54/650, 66/820 to 67/746, 73/158 to 73/268, 88/422 to 94/155) to two lane] [03 /EE/NHD/TENDER/2024-25/2442 DATE 10/10/2024][2024_MoRTH_830783_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Kolhapur - MoRTH
Last fetched | updated on 2024-11-24 15:09:32
Start Date: 2024-10-15 12:20:00
End Date: 2024-12-20 05:30:00
Opening Date: 2024-12-24 03:00:00
Share
[BITUMEN OVERLAY TO MADHYA PRADESH /MAHARASHTRA BORDER - BAPERA-TUMSAR-MOHADI-BHANDARA NEWLY DECLARED NH-543K (SECTION MP/MAHARASHTRA BORDER TO BHANDARA IN KM (55/00 TO KM 112/00) IN STATE OF MAHARASHTRA. ON EPC MODE] [NIT-30/EENH/NGP/2024-25][2024_MoRTH_830820_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nagpur - MoRTH
Last fetched | updated on 2024-11-24 15:09:23
Start Date: 2024-10-15 02:00:00
End Date: 2024-12-24 05:00:00
Opening Date: 2024-12-30 05:05:00
Share
[Rehabilitation- Up-gradation of Jalna -Sindkhed Raja-Mehakar Malegaon -Karanja Deogaon -Pulgaon to 2-4 LPS from Km. 0-00 to Km. 50 (L- 50 Km) of NH-753C on EPC mode.] [RO/MUM/TENDER/2024-25/05][2024_MoRTH_830834_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH
Last fetched | updated on 2024-11-24 15:09:15
Start Date: 2024-10-15 02:45:00
End Date: 2024-12-03 05:00:00
Opening Date: 2024-12-05 11:00:00
Share
[Rehabilitation -Up-gradation of Jalna - Sindkhed Raja- Mehakar Malegaon -Karanja Deogaon -Pulgaon to 2-4 LPS from Km. 50-00 to Km. 100 (L- 50 Km) of NH-753C on EPC mode.] [RO/MUM/TENDER/2024-25/06][2024_MoRTH_830838_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH
Last fetched | updated on 2024-11-24 15:08:55
Start Date: 2024-10-15 03:15:00
End Date: 2024-12-03 05:00:00
Opening Date: 2024-12-05 11:00:00
Share
[Rehabilitation- Up-gradation of Jalna- Sindkhed Raja-Mehakar Malegaon -Karanja Deogaon -Pulgaon to 2-4 LPS from Km. 100-00 to Km. 186-00 (L- 86 Km) of NH-753C on HAM mode.] [RO/MUM/TENDER/2024-25/07][2024_MoRTH_830845_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH
Last fetched | updated on 2024-11-24 15:08:47
Start Date: 2024-10-15 03:20:00
End Date: 2024-12-03 05:00:00
Opening Date: 2024-12-05 11:00:00
Share
[Rehabilitation - Up-gradation of Jalna - Sindkhed Raja-Mehakar Malegaon -Karanja Deogaon -Pulgaon to 2-4 LPS from Km. 186-00 to Km. 236-00 (L- 50 Km) of NH-753C on EPC mode.] [RO/MUM/TENDER/2024-25/08][2024_MoRTH_830857_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH
Last fetched | updated on 2024-11-24 15:08:27
Start Date: 2024-10-15 03:40:00
End Date: 2024-12-03 05:00:00
Opening Date: 2024-12-05 11:00:00
Share
[Supply Installation Commissioning Maintenance of Sensors Data Acquisition Data Transmission Analysis Management Reporting for the same for BHMS for New Cable Stayed Zuari Bridge, Old Zuari Bridge on NH-66 and Borim Bridge on NH-566 in State of Goa] [13/1/2024-25/PWD/ WDXIV/NH/ASW/09 Dt 15/10/2024][2024_MoRTH_830862_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||PWD / CE(NH)-Goa - MoRTH
Last fetched | updated on 2024-11-24 15:08:18
Start Date: 2024-10-16 11:30:00
End Date: 2024-11-29 11:00:00
Opening Date: 2024-12-02 11:00:00
Share
[Consultancy Services for Authoritys Engineer for Supervision of i Construction of Paderu bypass of 2L PS And ii Construction of 2 lane ROB in lieu of the LC no. KK 26 Railway Km 109 20 21 on NH 516E in the State of Andhra Pradesh] [MoRTH/PIU/VSKP/PaderuBypass ][2024_MoRTH_830898_1]
Ministry of Road Transport and Highways||P7 Delh - MoRTH||RO Vijayawada - MoRTH
Last fetched | updated on 2024-11-24 15:08:09
Start Date: 2024-10-16 01:00:00
End Date: 2024-12-02 03:00:00
Opening Date: 2024-12-03 03:00:00
Share
[Construction of LHS and its approaches in lieu of level crossing No.C-124 over Rewari-Sardulpur Railway line crossing NH-709 (Extn.) in Loharu town in the State of Haryana] [1][2024_MoRTH_820127_3]
Ministry of Road Transport and Highways||P1 Delhi - MoRTH||RO Chandigarh - MoRTH||NH Division-Rohatak - MoRTH
Last fetched | updated on 2024-11-24 15:08:00
Start Date: 2024-10-16 03:30:00
End Date: 2024-11-27 03:00:00
Opening Date: 2024-11-29 03:00:00
Share
[Consultancy Services for Authoritys Engi.or supervision of Improve.and upgradation ofnewly declared NH227B(84 Kosi Parikrama Marg)PackageV, from DesignKm.140.960(Patranga)to Km.160.200(Bahuvan Madar Majha) D/L19.240 Km.on(EPC) modein the State of U.P] [CE-RO/LKO/NH(O)/22/NH-227B (Pkg-V)/2022-23/AE Dt.16.10.2024][2024_MoRTH_831025_1]
Ministry of Road Transport and Highways||P2 Delhi - MoRTH||RO Lucknow - MoRTH
Last fetched | updated on 2024-11-24 15:07:52
Start Date: 2024-10-16 04:00:00
End Date: 2024-12-02 11:00:00
Opening Date: 2024-12-03 12:30:00
Share
[4-laning of Ponda to Bhoma section of NH-748 from Km 125.440 to Km 135.050 in the State of Goa on EPC Mode.] [RO/MUM/GOA/TENDER/2024-25/01][2024_MoRTH_831012_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH
Last fetched | updated on 2024-11-24 15:07:43
Start Date: 2024-10-17 10:00:00
End Date: 2024-11-30 05:00:00
Opening Date: 2024-12-02 11:00:00
Share
[Construction of Flyover at chainage Km 165.020 (Pastikudi) on NH-26 including approaches in the state of Odisha on EPC Mode.] [09 CE NH of 2024-25][2024_MoRTH_831331_1]
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhubaneswar - MoRTH||NH Odisha PWD-Kesinga - MoRTH
Last fetched | updated on 2024-11-24 15:07:34
Start Date: 2024-10-17 06:55:00
End Date: 2024-11-30 12:00:00
Opening Date: 2024-12-05 03:30:00
Share