https://wa.me/917779993003

Tenders

Filter

Showing 30001 to 30030 of 72243 results

NABARD RIDF XXVI water supply scheme to Muttom Karimkunnam and Kudayathoor panchayath in Idukki district Phase 1 Package 8 supply and laying of 450 mm DI 300 MM DI and 250mm DI] [WRD/KWA-CEP/TR/312/2022][2025_KWA_763106_1

Kerala Water Authority||Chief Engineer Central Region (Kochi)||Superintending Engineer PH Circle Muvattupuzha||Executive Engineer (Project Division Kattappana)

Dashboard Kerala Water Authority

Last fetched | updated on 2025-05-10 00:24:53

Start Date: 2025-05-03 04:30:00

End Date: 2025-05-12 03:00:00

Opening Date: 2025-05-13 03:00:00

Share:

Source: xxxx

Hiring of Vehicle 2025-26- Hiring of one number covered motor vehicle with GPS system to attend day to day duties WS Division Attingal ] [WRD/KWA-CE(SR)/TR/6342/2025][2025_KWA_762877_1

Kerala Water Authority||Chief Engineer Southern Region (Trivandrum)||Superintending Engineer PH Circle Thiruvananthap||Executive Engineer (Water Supply Division Attingal

Dashboard Kerala Water Authority

Last fetched | updated on 2025-05-10 00:24:45

Start Date: 2025-05-03 05:00:00

End Date: 2025-05-12 11:30:00

Opening Date: 2025-05-14 11:30:00

Share:

Source: xxxx

Annual mace of PH section TIRUR(AMC) Leakage repair of various size of pipe line under this section for the year 20252026 in Running contractAMC Thirunavaya 20252026] [04/2025-26KWA/EE/PH/EDPL][2025_KWA_763126_1

Kerala Water Authority||Chief Engineer Northern Region (Kozhikkode)||Superintending Engineer (PH Circle Malappuram)||Executive Engineer (PH Division Edappal)

Dashboard Kerala Water Authority

Last fetched | updated on 2025-05-10 00:24:38

Start Date: 2025-05-03 05:00:00

End Date: 2025-05-12 03:00:00

Opening Date: 2025-05-14 11:00:00

Share:

Source: xxxx

OM Water Supply SchemesMace of RWSS to Kottakkal parappurAnnual maintenace for the year 20252026Leak rectification works of pumping main and distribution system, amp WTP KozhichenaPerumbuzha pump house and pumping main under PH Section Kottakkal] [05/2025-26KWA/EE/PH/EDPL][2025_KWA_763146_1

Kerala Water Authority||Chief Engineer Northern Region (Kozhikkode)||Superintending Engineer (PH Circle Malappuram)||Executive Engineer (PH Division Edappal)

Dashboard Kerala Water Authority

Last fetched | updated on 2025-05-10 00:24:32

Start Date: 2025-05-03 05:30:00

End Date: 2025-05-12 03:00:00

Opening Date: 2025-05-14 11:00:00

Share:

Source: xxxx

O AND M - Water Supply Schemes RECONDITIONING OF R. O. PLANT - MACE OF RWSS TO THRIKKUNNAPPUZHA- RECONDITIONING OF R. O. PLANT LOCATED AT WARD 8 PATHIYANKARA TANK SITE OF THRIKKUNNAPPUZHA GRAMA PANCHAYATH] [WRD/KWA-CE(CR)/TR/3189/2025][2025_KWA_763119_1

Kerala Water Authority||Chief Engineer Central Region (Kochi)||Superintending Engineer (PH Circle Alappuzha)||Executive Engineer (PH Division Kayamkulam)||Asst Exec Eng (PH Sub Division Harippad)

Dashboard Kerala Water Authority

Last fetched | updated on 2025-05-10 00:24:26

Start Date: 2025-05-03 06:00:00

End Date: 2025-05-12 02:00:00

Opening Date: 2025-05-13 02:00:00

Share:

Source: xxxx

Comprehensive Annual Maintenance Contract (CAMC) For 67 Split Air-Conditioners in KUHS Thrissur Campus] [13715/2025/03/WORKS/KUHS][2025_KUHS_763098_1

Kerala University of Health Sciences

Dashboard Kerala University of Health Sciences

Last fetched | updated on 2025-05-10 00:17:03

Start Date: 2025-05-03 03:30:00

End Date: 2025-05-12 03:30:00

Opening Date: 2025-05-14 03:30:00

Share:

Source: xxxx

Construction of drain and road From house of Kanhaiya Lal to house of Bhola Shankar in ward no.-7 Radhey Kheda in N.P.Banthara, Lucknow by S.F.C..] [40/npban/viyonisu/2025-26][2025_DOLBU_1035237_11

Directorate of Local Bodies UP||Nagar Panchayat Banthara Lucknow

Dashboard Directorate of Local Bodies UP

Last fetched | created on 2025-05-03 22:24:44

Start Date: 2025-05-02 10:00:00

End Date: 2025-05-14 11:00:00

Opening Date: 2025-05-15 11:00:00

Share:

Source: xxxx

Start Date: 2025-05-03 11:00:00

End Date: 2025-05-13 05:00:00

Opening Date: 2025-05-16 11:00:00

Share:

Source: xxxx

Start Date: 2025-05-02 05:15:00

End Date: 2025-05-14 05:15:00

Opening Date: 2025-05-16 11:00:00

Share:

Source: xxxx

Construction of drain and road From house of Ajay to Tiles Road in ward no.-4 Ambedkar Nagar in N.P.Banthara, Lucknow by S.F.C..] [40/npban/viyonisu/2025-26][2025_DOLBU_1035237_14

Directorate of Local Bodies UP||Nagar Panchayat Banthara Lucknow

Dashboard Directorate of Local Bodies UP

Last fetched | created on 2025-05-03 22:24:12

Start Date: 2025-05-02 10:00:00

End Date: 2025-05-14 11:00:00

Opening Date: 2025-05-15 11:00:00

Share:

Source: xxxx

Painting works of K S B C godown at State Warehouse S.H. Mount in Kottayam District.] [No. KSWC/Constn/RM /SW/SH Mount Kottayam/2025-26 ][2025_KSWC_762832_1

Kerala State Warehousing Corporation||Construction Section

Dashboard Kerala State Warehousing Corporation

Last fetched | updated on 2025-05-10 00:14:53

Start Date: 2025-05-03 04:50:00

End Date: 2025-05-14 04:00:00

Opening Date: 2025-05-16 11:00:00

Share:

Source: xxxx

Supply of Empty Bobbin for LMW make LF4280A Speed Frame ] [KSTC/PRJ - PM/2025-26/127 ][2025_KSTCL_763135_1

Kerala State Textile Corporation Ltd||Commercial

Dashboard Kerala State Textile Corporation Ltd

Last fetched | updated on 2025-05-10 00:14:20

Start Date: 2025-05-03 05:30:00

End Date: 2025-05-12 11:00:00

Opening Date: 2025-05-13 11:05:00

Share:

Source: xxxx

Construction of Library at Nagar Panchayat, Kabrai (Work_02)] [52/NP KABRAI/2025-26 Dated-01.05.2025][2025_DOLBU_1035247_2

Directorate of Local Bodies UP||Nagar Panchayat Kabrai Mahoba

Dashboard Directorate of Local Bodies UP

Last fetched | created on 2025-05-03 22:23:12

Start Date: 2025-05-02 11:00:00

End Date: 2025-05-21 12:00:00

Opening Date: 2025-05-21 03:00:00

Share:

Source: xxxx

Supply of Water Proofing Membrane and Adhesive Cold Sticker ] [SRA05/123/2025][2025_KSRTC_762936_1

Kerala State Road Transport Corporation||Stores and Purchase

Dashboard Kerala State Road Transport Corporation

Last fetched | updated on 2025-05-10 00:12:32

Start Date: 2025-05-02 05:00:00

End Date: 2025-05-19 06:00:00

Opening Date: 2025-05-21 03:00:00

Share:

Source: xxxx

Construction of Yogshala Near Rani Laxmibai Park at Nagar Panchayat, Kabrai (Work_01)] [52/NP KABRAI/2025-26 Dated-01.05.2025][2025_DOLBU_1035247_1

Directorate of Local Bodies UP||Nagar Panchayat Kabrai Mahoba

Dashboard Directorate of Local Bodies UP

Last fetched | created on 2025-05-03 22:22:03

Start Date: 2025-05-02 11:00:00

End Date: 2025-05-21 12:00:00

Opening Date: 2025-05-21 03:00:00

Share:

Source: xxxx

Construction of smart village office Peringala] [KSNK/TECH/CHK/SVPA-82(R1)/2025][2025_KSNK_762933_1

Kerala State Nirmithi Kendra

Dashboard Kerala State Nirmithi Kendra

Last fetched | updated on 2025-05-10 00:11:17

Start Date: 2025-05-02 05:00:00

End Date: 2025-05-12 04:00:00

Opening Date: 2025-05-14 11:30:00

Share:

Source: xxxx

Construction of smart village office Nooranadu] [KSNK/TECH/CHK/SVNU-83(R1)/2025][2025_KSNK_762953_1

Kerala State Nirmithi Kendra

Dashboard Kerala State Nirmithi Kendra

Last fetched | updated on 2025-05-10 00:10:54

Start Date: 2025-05-03 11:15:00

End Date: 2025-05-12 04:00:00

Opening Date: 2025-05-14 11:30:00

Share:

Source: xxxx

Manapur me Bddhu ke ghar se holika dahan tak cc road nirman.] [50/26/04/2025][2025_DOLBU_1034978_10

Directorate of Local Bodies UP||Nagar Panchayat Ramganj Pratapgarh

Dashboard Directorate of Local Bodies UP

Last fetched | created on 2025-05-03 22:20:13

Start Date: 2025-05-02 12:00:00

End Date: 2025-05-23 12:00:00

Opening Date: 2025-05-23 02:00:00

Share:

Source: xxxx

Supply of Marketing Kiosk] [KSIE/MKTG/PKDBC/05/25-26][2025_KSIE_762759_1

Kerala State Industrial Enterprises Ltd||Marketing

Dashboard Kerala State Industrial Enterprises Ltd

Last fetched | updated on 2025-05-10 00:08:57

Start Date: 2025-05-03 05:00:00

End Date: 2025-05-12 09:00:00

Opening Date: 2025-05-13 10:00:00

Share:

Source: xxxx

Supply of Marketing Kiosk] [KSIE/MKTG/PKDBC/01/25-26][2025_KSIE_760156_1

Kerala State Industrial Enterprises Ltd||Marketing

Dashboard Kerala State Industrial Enterprises Ltd

Last fetched | updated on 2025-05-10 00:08:52

Start Date: 2025-05-03 05:00:00

End Date: 2025-05-12 09:00:00

Opening Date: 2025-05-13 10:00:00

Share:

Source: xxxx

Ward barchaoli me avdhes rawat ke ghar ke samne se lalji yadav ke ghar tak coverd nala nirman.] [50/26/04/2025][2025_DOLBU_1034978_14

Directorate of Local Bodies UP||Nagar Panchayat Ramganj Pratapgarh

Dashboard Directorate of Local Bodies UP

Last fetched | created on 2025-05-03 22:18:55

Start Date: 2025-05-02 12:00:00

End Date: 2025-05-23 12:00:00

Opening Date: 2025-05-23 02:00:00

Share:

Source: xxxx

Panampilly Nagar office complex - New plumbing line and common Toilet maintenance in 4 floors ] [2/2024-25/KSHB EKM][2025_KSHB_752681_4

Kerala State Housing Board||Office of the Chief Engineer||Deputy Chief Engineer

Dashboard Kerala State Housing Board

Last fetched | updated on 2025-05-10 00:07:18

Start Date: 2025-05-03 03:00:00

End Date: 2025-05-13 03:00:00

Opening Date: 2025-05-14 03:30:00

Share:

Source: xxxx

INTERLOCKING SADAK WO NALI NIRMAN KARYA SURAJPAL,CHANDRAPAL WO MITHLESH KE GHAR WALI GALI MOHALLA MOHAN SATI WARD NO 04 (80 MM) (SIMA VISTARIT AREA)] [etender/01][2025_DOLBU_1035269_2

Directorate of Local Bodies UP||Nagar Palika Parishad Maarhra Etah

Dashboard Directorate of Local Bodies UP

Last fetched | created on 2025-05-03 22:18:24

Start Date: 2025-05-02 12:00:00

End Date: 2025-05-19 03:00:00

Opening Date: 2025-05-19 04:00:00

Share:

Source: xxxx

Sangramganj me pakki sadak se mohan singh ke ghar tak cc road nirman.] [50/26/04/2025][2025_DOLBU_1034978_6

Directorate of Local Bodies UP||Nagar Panchayat Ramganj Pratapgarh

Dashboard Directorate of Local Bodies UP

Last fetched | created on 2025-05-03 22:14:42

Start Date: 2025-05-02 12:00:00

End Date: 2025-05-23 12:00:00

Opening Date: 2025-05-23 02:00:00

Share:

Source: xxxx

INTER LOCKING SADAK NIRMAN KARYA ANTYOSTHI STHAL KE SAMNE KASGANJ ROAD MOHALLA GAFURGANJ WARD NO 14 (80 MM)] [etender/01][2025_DOLBU_1035269_5

Directorate of Local Bodies UP||Nagar Palika Parishad Maarhra Etah

Dashboard Directorate of Local Bodies UP

Last fetched | created on 2025-05-03 22:13:00

Start Date: 2025-05-02 02:00:00

End Date: 2025-05-19 03:00:00

Opening Date: 2025-05-19 04:00:00

Share:

Source: xxxx

Start Date: 2025-04-29 04:15:00

End Date: 2025-05-13 02:00:00

Opening Date: 2025-05-14 03:00:00

Share:

Source: xxxx

Construction of 46.5 km and Re conductoring of 6.2 km 11KV OH line using ACSR Raccoon under Kasaragod Special Package for 2024-25] [KSEB/DCE/KSD/2024-25/05 Dated 27.03.2025 ][2025_KSEB_755483_2

Kerala State Electricity Board||Chief Engineer (Distribution North)||Dpty Chief Engg Electrical Circle Kasargode

Dashboard Kerala State Electricity Board

Last fetched | updated on 2025-05-09 23:55:18

Start Date: 2025-05-02 10:00:00

End Date: 2025-05-28 04:00:00

Opening Date: 2025-05-30 11:00:00

Share:

Source: xxxx

Supply of 405km of 11kV 3Cx300sqmm XLPE AL UG cable (Armoured)] [KSEB/SCM/eP.09/25-26/XD2/11kV 3Cx300sqmm XLPE AL UG Cable(Armoured)dtd 2.5.2025][2025_KSEB_762911_1

Kerala State Electricity Board||Supply Chain Management

Dashboard Kerala State Electricity Board

Last fetched | updated on 2025-05-09 23:55:13

Start Date: 2025-05-02 05:00:00

End Date: 2025-05-26 04:00:00

Opening Date: 2025-05-30 11:30:00

Share:

Source: xxxx

Supplying of Taxi Jeep with Driver and fuel to Electrical Section, Aroor. ] [EE/ED/CTL/04/2025-26/03-5-2025][2025_KSEB_762917_1

Kerala State Electricity Board||Chief Engineer (Distribution Central)||Dpty Chief Engg Electrical Circle Alappuzha||EE Electrical Div Cherthala

Dashboard Kerala State Electricity Board

Last fetched | updated on 2025-05-09 23:55:07

Start Date: 2025-05-03 10:00:00

End Date: 2025-05-17 05:00:00

Opening Date: 2025-05-19 11:00:00

Share:

Source: xxxx

Drawing new HT ABC feeder from Kanjirappally Substation to Anakkal] [KSEBL ETENDER/2025-26/5157/08][2025_KSEB_762865_1

Kerala State Electricity Board||Chief Engineer (Distribution Central)||Dpty Chief Engg Electrical Circle Pala

Dashboard Kerala State Electricity Board

Last fetched | updated on 2025-05-09 23:55:01

Start Date: 2025-05-03 11:00:00

End Date: 2025-05-12 04:00:00

Opening Date: 2025-05-14 11:00:00

Share:

Source: xxxx