Showing 63271 to 63300 of 63570 results
Items: Corrosion Rate Analyzer Quantity: 1
Ministry of Commerce and Industry Department for Promotion of Industry & Internal Trade
Idler pully bracket with pully set,Cooler fan drive assembly,Cooler fan pully,Water pump pully,Fuel
Ministry of Civil Aviation AI Airport Services Limited
Modular Laboratory Work benches & Furniture
Ministry of Health and Family Welfare Department of Health and Family Welfare
gear boxes installed in coke cutting isolation valve and vapour valve
Ministry of Petroleum and Natural Gas INDIAN OIL CORPORATION LIMITED
3D 4K Laparoscopy System with High Definition Camera System
Ministry of Health and Family Welfare Department of Health and Family Welfare
SPARES STATOR GVSE800484R0017A GEPIL,SPARES STATOR GVSE800484R0017B GEPIL,SPARES STATOR CSG GVSE800
Ministry of Power NA
Items: -150 degree Refrigerator Quantity: 1
Ministry of Health and Family Welfare Department of Health and Family Welfare
M3401640010,M3401640011,M3401640012,M3401640014,M3401640017,M3401640018,M3401640021,M3401640022,M34
Ministry of Power NTPC SAIL Power Company Ltd
BONNET GUIDE BUSHING,PN MT153and as per attached bill of materials,GASKET PN 441278900 and as per a
Ministry of Petroleum and Natural Gas INDIAN OIL CORPORATION LIMITED
Item No. 10: 8845043064: ANION RESIN FOR MB EXCHANGER/SBA/WBA/SAC,Item No. 20: 8845043074: CATION R
Ministry of Petroleum and Natural Gas INDIAN OIL CORPORATION LIMITED
[4 or 6 lanning of Vazahayoor to Iringaullur section of NH966 (greenfield ICR34) from km.113.000 to km.121.006 in the State of Kerala in HAM mode under Bharatmala] [NHAI/12013/Vazahayoor Iringaullur/2022][2022_NHAI_130962_1]
National Highways Authority of India||Head Office - NHAI||Technical - NHAI
Last fetched | updated on 2024-11-27 22:30:06
Start Date: 2022-10-03 06:00:00
End Date: 2024-12-04 11:00:00
Opening Date: 2024-12-05 11:30:00
Share
[4 or 6 laning of Karakkunnu to Vazahayoor section of NH 966 from km. 87.930 to km. 113.000 in the State of Kerala on Hybrid Annuity mode under Bharatmala] [NHAI/11014/KL/Karakkunnu Vazahayoor/2022 Proc][2022_NHAI_131529_1]
National Highways Authority of India||Head Office - NHAI||Technical - NHAI
Last fetched | updated on 2024-11-27 22:29:55
Start Date: 2022-10-10 06:00:00
End Date: 2024-12-04 11:00:00
Opening Date: 2024-12-05 11:30:00
Share
[4Laning of near Satai ghat to Chowka sec NH34 from D.Ch. 89.875 to DCh. 145.000 (Total Length 55.125 kms) in the State of Madhya Pradesh (PKG3) on HAM.] [NHAI/HQ/MP/ Satai Ghat Chowka/ PKG3/2023][2023_NHAI_161997_1]
National Highways Authority of India||Head Office - NHAI||Technical - NHAI
Last fetched | updated on 2024-11-27 22:28:18
Start Date: 2023-07-22 09:00:00
End Date: 2024-12-02 11:00:00
Opening Date: 2024-12-03 11:30:00
Share
[Independent Engineer services for Construction of 4-Lane GF Highway from Parsarma Ch.0.000 to Bishnupur Ch.36.450 including Spur Connectivity of 1.75 km with Supaul (Parsarma-Araria Pkg-1) of NH-327E in the state of Bihar under NH(O)] [NHAI/Bihar/IE/Parsarma Araria/pkg-1/2023-24][2024_NHAI_182451_1]
National Highways Authority of India||Head Office - NHAI||Technical - NHAI
Last fetched | updated on 2024-11-27 17:03:56
Start Date: 2024-01-19 05:05:00
End Date: 2024-12-03 11:00:00
Opening Date: 2024-12-04 11:30:00
Share
[Tolling Operation Maintenance and Transfer of Kanpur Lucknow Ayodhya section and Ayodhya Gorakhpur section of NH 27 in Uttar Pradesh (TOT Bundle 17)] [NHAI/AssetMonetization/ TOT/2024-25/TOTB-17][2024_NHAI_198389_1]
National Highways Authority of India||Head Office - NHAI||Administration - NHAI
Last fetched | updated on 2024-11-27 22:20:59
Start Date: 2024-06-14 09:00:00
End Date: 2024-12-30 11:00:00
Opening Date: 2024-12-31 11:30:00
Share
[Access Controlled Highway of 4 Lane with Paved Shoulders from Design Ch. 0.000 Ranganathpura (Hassan) to Design Ch 26.000 Kammaragatta in Hassan Hiriyur section of EC-20 in Karnataka on HAM under NH (O) Project Length 26 kms (Package 1)] [NHAI/Hassan-Hiriyur/Pkg-1/ 2024/Civil/KNT/177263][2024_NHAI_201384_1]
National Highways Authority of India||Head Office - NHAI||Technical - NHAI
Last fetched | updated on 2024-11-26 21:58:07
Start Date: 2024-07-15 12:00:00
End Date: 2024-11-28 11:00:00
Opening Date: 2024-11-29 11:30:00
Share
[Construction of 2 nos of Flyover on Omarpur Junction of NH34 from Design Ch. 245.50 to Design Ch. 247.500 (Length2.0 km) and on Dhulian Junction of NH 34 from Design Ch. 274.300 to Design Ch. 276.500 (Length2.2 km) in West Bengal on EPC Mode ] [NHAI/RO/KOL/001/2023/PQ/ KhalilurRahaman/ VIP/E-186414][2024_NHAI_201974_1]
National Highways Authority of India||Head Office - NHAI||Technical - NHAI
Last fetched | updated on 2024-11-27 22:17:50
Start Date: 2024-07-19 06:30:00
End Date: 2024-12-02 11:00:00
Opening Date: 2024-12-03 11:30:00
Share
[DEVELOPMENT, OPERATION AND MAINTENANCE OF WAYSIDE AMENITIES ON DELHI-MUMBAI EXPRESSWAY ON DAUSA-LALSOT-KOTA SECTION ON LEASE BASIS] [NHLML/WSA/NORTH/2/DBOT/241946][2024_NHAI_203334_1]
National Highways Authority of India||National Highways Logistics Management Limited (HQ Delhi)
Last fetched | updated on 2024-11-27 22:15:51
Start Date: 2024-07-31 06:00:00
End Date: 2024-12-09 03:00:00
Opening Date: 2024-12-10 03:00:00
Share
[Upgrad of Exist Road to 4/6 Lane with 2Lane Service Road on both sides and Const. of 8Lane EF at Tier1 on Single Pier sec frm Nashik Phata to Alandi Phata PkgI of NH60 Frm Km.12.190 to Km.28.890 in Maharashtra on BOT basis under NH O] [NHAI/Tech/ MH/N-P-K /2024/ Pkg-1][2024_NHAI_204916_1]
National Highways Authority of India||Head Office - NHAI||Technical - NHAI
Last fetched | updated on 2024-11-27 22:14:23
Start Date: 2024-08-14 01:30:00
End Date: 2024-12-26 11:00:00
Opening Date: 2024-12-27 11:30:00
Share
[Six Laning of Surat- Nashik- Ahmednagar- Solapur- MH/KNT Border Greenfield stretch Package-IV from km 107.000 (Ambegaon) to km 146.000 (Chehedi Khurdh) in Maharashtra to be executed on HAM under NH(O)] [NHAI/Tech/MH /S-N-A-S (Pkg-IV)/2024][2024_NHAI_206894_1]
National Highways Authority of India||Head Office - NHAI||Technical - NHAI
Last fetched | updated on 2024-11-27 22:12:17
Start Date: 2024-09-02 06:50:00
End Date: 2024-12-26 11:00:00
Opening Date: 2024-12-27 11:30:00
Share
[Construction of Six Lane Access Controlled Greenfield Highway from Katgaon village to Hasapur village section of Surat Nashik Ahmednagar Solapur Akkalkot on HAM Mode in Maharashtra under NH (O) Package XIII (Km 486.000 to Km 512.000)] [NHAI/Tech/MH / S-N-A-S/ Pkg XIII/2024][2024_NHAI_206903_1]
National Highways Authority of India||Head Office - NHAI||Technical - NHAI
Last fetched | updated on 2024-11-27 22:10:50
Start Date: 2024-09-03 09:00:00
End Date: 2024-12-26 11:00:00
Opening Date: 2024-12-27 11:30:00
Share
[DEVELOPING, OPERATING AND MAINTAINING OF WAYSIDE AMENITIES ON DELHI- MUMBAI EXPRESSWAY in VARIOUS SECTIONS ON LEASE BASIS] [NHLML/HQ/WSA/DME/JV-VM][2024_NHAI_206923_1]
National Highways Authority of India||Head Office - NHAI||Technical - NHAI
Last fetched | updated on 2024-11-27 22:10:03
Start Date: 2024-09-03 11:00:00
End Date: 2024-12-12 03:00:00
Opening Date: 2024-12-13 03:30:00
Share
[Construction of STRR-NH948A Thattekere (Kanakapura Taluk) to Bagganadoddi (Anekal Taluk) from km 112.640 to km 120.980 (Design Chainage) in Karnataka on HAM Project Length - 8.340 km (Phase II Package 2)] [NHAI/STRR/Phase-II/Pkg-2/ 2024/Civil/KNT/259966][2024_NHAI_207427_1]
National Highways Authority of India||Head Office - NHAI||Technical - NHAI
Last fetched | updated on 2024-11-27 22:09:12
Start Date: 2024-09-06 09:00:00
End Date: 2024-12-23 11:00:00
Opening Date: 2024-12-24 11:30:00
Share
[Construction of STRR (West side) NH948A Kunagal Ramanagara Taluk) to Thattekere (Kanakapura Taluk) from km 79.000 to km 112.640 (Design) Package-1 in the state of Karnataka on Hybrid Annuity Mode] [NHAI/KNT/STRR/Phase-II/ Pkg-I/2022/182995][2024_NHAI_207426_1]
National Highways Authority of India||Head Office - NHAI||Technical - NHAI
Last fetched | updated on 2024-11-27 22:09:04
Start Date: 2024-09-06 09:00:00
End Date: 2024-12-23 11:00:00
Opening Date: 2024-12-24 11:30:00
Share
[CS for IE for Construction of Six Laning of Surat Nashik Ahmednagar Solapur MH/KNT Border Greenfield stretch Package X and Package XI in the State of Maharashtra on Hybrid Annuity Mode under NH(O)] [NHAI/Tech/MH/ IE/S N A S (Pkg X n XI)/2024][2024_NHAI_207714_1]
National Highways Authority of India||Head Office - NHAI||Technical - NHAI
Last fetched | updated on 2024-11-27 22:08:04
Start Date: 2024-09-09 04:00:00
End Date: 2024-12-26 11:00:00
Opening Date: 2024-12-27 11:30:00
Share
[Consultancy services for Independent Engineer for Construction of Six Laning of Surat Nashik Ahmednagar Solapur MH/KNT Border Greenfield stretch Package -XV and Package XVI in Maharashtra on Hybrid Annuity Mode under NH(O) ] [NHAI/Tech/MH/IE/S N A S (Pkg-XV and XVI)/2024][2024_NHAI_207725_1]
National Highways Authority of India||Head Office - NHAI||Technical - NHAI
Last fetched | updated on 2024-11-27 16:51:07
Start Date: 2024-09-09 04:30:00
End Date: 2024-12-26 11:00:00
Opening Date: 2024-12-27 11:30:00
Share
[Protection work of Gola River bridge and flow channelization at Ch 84 on Rudrapur Kathgodam Section of NH 87 in the State of Uttarakhand] [NHAIPIUrudrapur6][2024_NHAI_207911_1]
National Highways Authority of India||RO-Dehradun - NHAI||Rudrapur - NHAI
Last fetched | updated on 2024-11-27 22:07:38
Start Date: 2024-09-11 09:00:00
End Date: 2024-12-11 12:30:00
Opening Date: 2024-12-12 12:30:00
Share
[Consultancy Services of Preparation of DPR for development of 4-lane greenfield highway from Kuppam-Hosur-Bengaluru (STRR) in the State of Andhra Pradesh.] [APDIV-2022/15/2024-Andhra Pradesh Division ][2024_NHAI_208047_1]
National Highways Authority of India||Head Office - NHAI||Technical - NHAI
Last fetched | updated on 2024-11-27 22:07:30
Start Date: 2024-09-12 09:00:00
End Date: 2024-12-12 11:00:00
Opening Date: 2024-12-13 11:30:00
Share
[Develop. of 4lane AC Sirhind Sehna sec of NH205AG from DAK Expressway NE5 near Malerkotla Ch79.200 to junc with LB Highway NH754 AD near vill Sehna Ch.134.290 TL 55.09 Km PKGII part of Mohali Barnala IC in Punjab under NH(O) on HAM] [NHAI/PB/ Sirhind-Sehna /2024/Pkg-2][2024_NHAI_208376_1]
National Highways Authority of India||Head Office - NHAI||Technical - NHAI
Last fetched | updated on 2024-11-27 22:06:55
Start Date: 2024-09-14 09:00:00
End Date: 2024-12-02 11:00:00
Opening Date: 2024-12-03 11:30:00
Share
Fourier Transform Infra Red (FTIR) Spectrometer
Ministry of Health and Family Welfare Department of Health and Family Welfare