Showing 65071 to 65100 of 66309 results
HIGH END PREMIUM COLOR DOPPLER SYSTEM,DR X-RAY SYSTEM,CR System with Dry Imager,C-ARM,USG MACHINE
Ministry of Health and Family Welfare Department of Health and Family Welfare
Ammonia Roll,Ammonia Gas,Measurement Book,Level Book,Field Book,Polyster Film 100 Micron,Tracing Cl
Ministry of Coal COAL INDIA LIMITED
[Rehabilitation and Up-gradation to 2 Lane with paved shoulder configuration for the work of Charthana Jintur section of NH 752 I from Design Km.25 100 to 47 100 Design Length 22 00 Km in the State of Maharashtra on EPC Mode] [EENH/Jalna/Tender/NIT No-06/1644][2024_MoRTH_830341_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nagpur - MoRTH
Last fetched | updated on 2024-11-26 16:10:31
Start Date: 2024-10-11 09:00:00
End Date: 2024-12-09 05:30:00
Opening Date: 2024-12-10 11:00:00
Share
[Upgradation to 2/4 Lane Paved Shoulder in section Wadsa to Bhuti nalla From Km. 438.930 to km 448.518 Section (Length 9.59 Km.) on NH 543 Gondia Amgaon Deori Korchi Kurkheda Wadsa Bramhapuri Road in the State of Maharashtra] [NIT_04/EENH/GAD/2024-25][2024_MoRTH_830343_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Nagpur - MoRTH
Last fetched | updated on 2024-11-26 16:10:11
Start Date: 2024-10-11 09:00:00
End Date: 2024-12-26 05:55:00
Opening Date: 2024-12-30 11:00:00
Share
[Widening and Strengthening of existing carriageway in the Soni to Wadsa section of NH353C from km. 55.800 to Km. 64.850 Length 9.050 km to two lane with paved shoulders Four Lane standards on Sakoli Lakhandur Wadsa Armori Gadchiroli Chamorshi ] [NIT_04/EENH/GAD/2024-25][2024_MoRTH_830344_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Nagpur - MoRTH
Last fetched | updated on 2024-11-24 15:22:06
Start Date: 2024-10-11 09:00:00
End Date: 2024-12-26 05:55:00
Opening Date: 2024-12-30 11:00:00
Share
[Construction of RCC Drain, Pedestrian Guard Railing, BT Paved shoulder in Adyal, Chittaranjanpur, Yenapur Village from Km. 160.860 to 161.500, 162.200 to 164.200 (Length 2.640 Km) on NH 353C on Sakoli Lakhandur Wadsa Armori Gadchiroli Chamorshi ] [NIT_04/EENH/GAD/2024-25][2024_MoRTH_830183_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Nagpur - MoRTH
Last fetched | updated on 2024-11-23 14:39:35
Start Date: 2024-10-11 09:00:00
End Date: 2024-12-26 05:55:00
Opening Date: 2024-12-30 11:00:00
Share
[Construction of RCC Drain, Pedestrian Guard Railing, BT Paved shoulder in Ashti Town from Km 179.350 to 181.650 (Length 2.300 Km) of NH 353C on Sakoli Lakhandur Wadsa Armori Gadchiroli Chamorshi Ashti Allapalli Sironcha Road in the state of M] [NIT_04/EENH/GAD/2024-25][2024_MoRTH_830342_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Nagpur - MoRTH
Last fetched | updated on 2024-11-26 16:09:43
Start Date: 2024-10-11 09:00:00
End Date: 2024-12-26 05:55:00
Opening Date: 2024-12-30 11:00:00
Share
[Construction of new high level bridge on upstream side of existing bridge known as Ahilya Bridge across bhima River Chainage 37.686 L 365.00 mtr along with its] [NHD/TC/EPC/2723/2024][2024_MoRTH_830222_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-SOLAPUR - MoRTH
Last fetched | updated on 2024-11-26 16:09:32
Start Date: 2024-10-11 10:00:00
End Date: 2024-12-02 05:30:00
Opening Date: 2024-12-04 01:00:00
Share
[Contractor Risk and Cost Basis Rehabilitation and UP gradation to two lanes with paved shoulder four lane configurations for the work of NH 561 A Pandharpur Mangalwedha Marwade Umdai from Ch. 40.800 to ch.95.136 Package No.II Length 54.336 in the sta] [NHD/TC/EPC/2726/2024][2024_MoRTH_830374_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-SOLAPUR - MoRTH
Last fetched | updated on 2024-11-26 16:09:18
Start Date: 2024-10-11 01:00:00
End Date: 2024-12-02 05:30:00
Opening Date: 2024-12-04 03:00:00
Share
[PBMC] [1436M/13M-NHCK/24 date 09.10.2024][2024_MoRTH_830357_1]
Ministry of Road Transport and Highways||P2 Delhi - MoRTH||RO Lucknow - MoRTH||NH Division-Jhansi - MoRTH
Last fetched | updated on 2024-11-26 16:08:59
Start Date: 2024-10-11 03:00:00
End Date: 2024-12-11 03:00:00
Opening Date: 2024-12-12 03:00:00
Share
[Maintenance of Gadi Manwat section of NH 61 Km 342 000 to Km 442 275 2L PS 4L Configuration road in state of Maharashtra under Performance Based Maintenance Contract PBMC 2024 2025 ] [EENHD/Chh.S./Tender/NIT No-6/3002200 ][2024_MoRTH_829654_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Aurangabad - MoRTH
Last fetched | updated on 2024-11-26 16:08:06
Start Date: 2024-10-11 04:00:00
End Date: 2024-12-02 05:30:00
Opening Date: 2024-12-03 12:30:00
Share
[Maintenance of Daulatabad T Point to Khultabad section of NH 752 H Km 96 000 to Km 110 000 2L PS 4L Configuration road in the State of Maharashtra under Performance Based Maintenance Contract PBMC 2024 2025] [EENHD/Chh.S./Tender/NIT No-7/3002199][2024_MoRTH_829910_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Aurangabad - MoRTH
Last fetched | updated on 2024-11-20 20:12:20
Start Date: 2024-10-11 04:00:00
End Date: 2024-12-04 05:30:00
Opening Date: 2024-12-05 12:00:00
Share
[Construction of Foot Over Bridge at package V of NH.66 at Parshuram Ghat and Kamthe Parshuram Ghat.Arawali Section and Service Road, Bus bay with Bus Shelter etc Dist. Ratnagiri in State of Maharashtra. Annual Plan 2024-25] [Bid/Package no/EENH/Ratnagiri/AB/TC/2702 ][2024_MoRTH_830473_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Ratnagiri - MoRTH
Last fetched | updated on 2024-11-26 16:07:48
Start Date: 2024-10-11 06:00:00
End Date: 2024-12-17 05:30:00
Opening Date: 2024-12-18 05:30:00
Share
[Road Safety works in Panvel - Panji Road NH 66 Erstwhile NH-17 in Km.241.300 .76.880 to 332.200 165.270 Construction of Foot Bridge , Bus-bayand Bus.shelter In Ratnagiri district in the State of Maharashtra On EPC.HPM] [Bid/Package no/EENH/Ratnagiri/AB/TC/2703][2024_MoRTH_830482_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Ratnagiri - MoRTH
Last fetched | updated on 2024-11-26 16:07:39
Start Date: 2024-10-11 06:05:00
End Date: 2024-12-17 05:30:00
Opening Date: 2024-12-18 05:30:00
Share
[Installation of Metal Beam Crash Barrier on NH 66 From Km 165.100 Ex.Ch.332.170 to Km 302/720 Ex.Ch. 471.330 in Watul .Patradevi Section under road safety Annual plan in Ratnagiri and Sindhudurg district in the state of Maharashtra] [Bid/Package no/EENH/Ratnagiri/AB/TC/2704][2024_MoRTH_830489_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Ratnagiri - MoRTH
Last fetched | updated on 2024-11-26 16:07:30
Start Date: 2024-10-11 06:20:00
End Date: 2024-12-17 05:30:00
Opening Date: 2024-12-18 05:30:00
Share
[Consultancy services for AE for rehabilitaion and upgradation 2_4 lane with paved shoulder configuration for the work of gangakhed palam loha road NH361F from km 169.00 to 210.00 desigh chainage km 30.400 to 71.400 in state of maharashtra on EPC mode] [9/EENH/NED/3937/2024-25][2024_MoRTH_830458_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nanded - MoRTH
Last fetched | updated on 2024-11-26 16:07:19
Start Date: 2024-10-11 06:30:00
End Date: 2024-11-27 05:30:00
Opening Date: 2024-11-29 12:00:00
Share
[Beautification works in stretch Ch. Km. 367.20 to 471.300 of NH 66 in Sindhudurg District Talgaon to Patradevi section in the state of Maharashtra] [Bid/Package no/EENH/Ratnagiri/AB/TC/2705][2024_MoRTH_830492_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Ratnagiri - MoRTH
Last fetched | updated on 2024-11-26 16:06:59
Start Date: 2024-10-11 06:35:00
End Date: 2024-12-17 05:30:00
Opening Date: 2024-12-18 05:30:00
Share
[Provideing Missing bus bays ,pick up sheds ,service roads ,slip roads ,on NH 66 at Ch. 332.200 to 471.300 in the state of Maharashtra] [Bid/Package no/EENH/Ratnagiri/AB/TC/2706][2024_MoRTH_830494_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Ratnagiri - MoRTH
Last fetched | updated on 2024-11-26 16:06:42
Start Date: 2024-10-11 06:45:00
End Date: 2024-12-17 05:30:00
Opening Date: 2024-12-18 05:30:00
Share
[Upgradation of Nashik Peth Road NH No 848 in Ghat Section of Forest Lenth (Km 38-970 to Km 41-816 and Km 49-730 to Km 51-413) to 2LPS in Nashik District in the State of Maharashtra.] [NIT-05/EENH/NASHIK/4630][2024_MoRTH_830480_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Pune - MoRTH
Last fetched | updated on 2024-11-26 16:06:26
Start Date: 2024-10-11 06:55:00
End Date: 2024-12-09 05:30:00
Opening Date: 2024-12-11 11:00:00
Share
[Rehabilitation and upgradation by concreting to 2LPS of Kalyan-Nirmal Road from design Km 37-850 to 57-900 of NH-61 in Thane District in the state of Maharashtra] [NHD/Tender/1776][2024_MoRTH_830469_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Thane - MoRTH
Last fetched | updated on 2024-11-26 16:05:42
Start Date: 2024-10-11 06:55:00
End Date: 2024-12-30 05:30:00
Opening Date: 2025-01-01 11:00:00
Share
[ Protection work and Safety measures to Chouka Ghat Portion of NH-753-F Chhatrapati Sambhajinagar Jalgaon road in the state of Maharashtra.] [EENH/Chh.S/Tender/NIT No-11/3002267][2024_MoRTH_830511_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Aurangabad - MoRTH
Last fetched | updated on 2024-11-26 16:04:22
Start Date: 2024-10-12 09:00:00
End Date: 2024-12-09 05:30:00
Opening Date: 2024-12-10 12:00:00
Share
[Reconstruction of sub.standard weak Major Bridge at Bav Km 117.110 and Major Bridge at Anjanari Km 143.500 on Mumbai Goa Highway NH.66 in Kante. Waked Section under Annual Plan 2024.25] [Bid/Package no/EENH/Ratnagiri/AB/TC/2708][2024_MoRTH_830501_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Ratnagiri - MoRTH
Last fetched | updated on 2024-11-26 16:05:04
Start Date: 2024-10-12 09:00:00
End Date: 2024-12-17 05:30:00
Opening Date: 2024-12-18 05:30:00
Share
[Rehabilitation and Upgradation of 4 lane road with paved shoulders of Barshi Takli Bypass (NH 161 A) from Design km. 0.000 to km.3.160 (Total Length 3.160 Km) in the state of Maharashtra on EPC Basis mode] [12/EENH/AKL/2024-25, Dt.11/10/2024][2024_MoRTH_830529_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Akola - MoRTH
Last fetched | updated on 2024-11-26 16:03:57
Start Date: 2024-10-12 02:15:00
End Date: 2024-12-10 05:30:00
Opening Date: 2024-12-12 05:30:00
Share
[Performance based Maintenance Contracts (PBMC) Estimate for Upgradation to two lane with paved shoulder from Km 97/487 to Km 137/250 of Nagbhid Armori Section (Pckg III) of NH 353D in the state of Maharashtra for 5 year Maintenance Period] [NIT-09/EENH/NGP/2024-25][2024_MoRTH_830533_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nagpur - MoRTH
Last fetched | updated on 2024-11-26 16:03:31
Start Date: 2024-10-12 02:30:00
End Date: 2024-12-24 05:30:00
Opening Date: 2024-12-30 05:35:00
Share
[PERFORMANCE BASED MAINTENANCE CONTRACTS SAONER BYPASS ON ] [NIT-10/EENH/NGP/2024-25][2024_MoRTH_830536_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nagpur - MoRTH
Last fetched | updated on 2024-11-26 16:03:05
Start Date: 2024-10-12 03:00:00
End Date: 2024-12-24 05:00:00
Opening Date: 2024-12-30 05:05:00
Share
[Maintenace of Fourlanning of Deulgaon Raja Bypass section of NH753A (Design km. 0.00 to km 5.580) in the state of Maharashtra for 5 year Maintenance Period] [13/EENH/AKl/2024-25, Dt.11/10/2024][2024_MoRTH_830538_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Akola - MoRTH
Last fetched | updated on 2024-11-26 16:02:47
Start Date: 2024-10-12 03:15:00
End Date: 2024-12-20 05:30:00
Opening Date: 2024-12-23 12:00:00
Share
[PERFORMANCE BASED MAINTENANCE CONTRACTS REHABILITATION AND UP-GRADATION OF NAGPUR KATOL WARUD CHANDURBAZR STATE HIGHWAY FROM EXISTING KM 60/100 ( END OF KATOL BYPASS ) TO 101/085 ( WARUD UPTO JOINT JUNCTION ) DESIGN KM 60/100 TO KM 100/565 FROM TWO ] [NIT-11/EENH/NGP/2024-25][2024_MoRTH_830539_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nagpur - MoRTH
Last fetched | updated on 2024-11-26 16:02:35
Start Date: 2024-10-12 03:20:00
End Date: 2024-12-24 05:00:00
Opening Date: 2024-12-30 05:05:00
Share
[Madhyapradesh / Maharashtra Border (Bapera) to Bhandara of NH-543K from design km 55/00 to 56/100 57/200 to 58/00 61/500 to 81/200 82/00 to 88/400 90/500 to 91/00 92/500 to 93/500 96/700 to 97/00 98/00 to 108/00 and 110/00 to 112/00 (Total Length ] [NIT-12/EENH/NGP/2024-25][2024_MoRTH_830541_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nagpur - MoRTH
Last fetched | updated on 2024-11-26 16:02:26
Start Date: 2024-10-12 03:45:00
End Date: 2024-12-24 05:00:00
Opening Date: 2024-12-30 05:05:00
Share
[Rehabilitation and Up-Gradation of Wardha (Salod Hirapur) - Pulgaon Section of NH 347A from Km 0/000 to Km 24/887(Design Chainage Km 0/000 to Km 24/792) to Two Lane with paved shoulder in the state of Maharashtra on EPC mode] [NIT-13/EENH/NGP/2024-25][2024_MoRTH_830543_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nagpur - MoRTH
Last fetched | updated on 2024-11-26 16:02:15
Start Date: 2024-10-12 04:05:00
End Date: 2024-12-24 05:00:00
Opening Date: 2024-12-30 05:05:00
Share
[Balance work of Up-Gradation of Tirora Gondia section of NH 753 to Two Lane with Paved Shoulders / 4 Lane in Km. 87/000 to 92/152 and Km. 98/100 to 105/405 Total Length 12/457 Km in Gondia District in the state of Maharashtra on EPC Mode] [NIT-14/EENH/NGP/2024-25][2024_MoRTH_830545_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nagpur - MoRTH
Last fetched | updated on 2024-11-26 16:02:06
Start Date: 2024-10-12 04:45:00
End Date: 2024-12-24 05:00:00
Opening Date: 2024-12-30 05:05:00
Share