https://wa.me/917779993003

Tenders

Filter

Showing 72691 to 72720 of 77087 results

JJM Providing FHTC connections in Chinnakanal Panchayath pacage 1 Supplying, laying, and commisioning of 200mm DI pumping main and GLSR at Sooryanelly] [34/2024-25/SE/PHC/IDK/7328][2025_KWA_732260_1

Kerala Water Authority||Chief Engineer Central Region (Kochi)||Superintending Engineer (PH Circle Idukki)

Dashboard Kerala Water Authority

Last fetched | updated on 2025-04-18 15:43:39

Start Date: 2025-01-31 02:00:00

End Date: 2025-04-28 04:00:00

Opening Date: 2025-04-30 04:30:00

Share

(JJM) -2023-24 CARWSS to Alakode and adjoining villages shifting and replacement of pipe line in Chelachuvadu Vannappuram road] [33/2024-25/SE/PHC/IDK/13443][2025_KWA_732195_1

Kerala Water Authority||Chief Engineer Central Region (Kochi)||Superintending Engineer (PH Circle Idukki)

Dashboard Kerala Water Authority

Last fetched | updated on 2025-04-18 15:43:44

Start Date: 2025-01-31 02:00:00

End Date: 2025-04-28 04:00:00

Opening Date: 2025-04-30 04:30:00

Share

StatePlan2022 23 Urgent Rectification of damaged 150 mm SW Pipes with 300mm SW Pipe and Construction of new Manholes from Decent Mukku jn to Pumphouse road Under Sn II Kuriathy ] [WRD/KWACESR/TR/1778/2022(RT5)][2025_KWA_733688_1

Kerala Water Authority||Chief Engineer Southern Region (Trivandrum)||Superintending Engineer PH Circle Thiruvananthap||Exec Engg (Sewerage Maintenance Division TVM

Dashboard Kerala Water Authority

Last fetched | updated on 2025-04-18 15:43:33

Start Date: 2025-02-03 05:00:00

End Date: 2025-04-21 03:00:00

Opening Date: 2025-04-23 03:00:00

Share

WB 04MTN 013] [37/SE/RRNMU-Bwn-Circle/2024-25 (1st Call)][2025_PRD_826412_1

PANCHAYAT AND RURAL DEVELOPMENT||WBSRDA||PURBA BURDWAN DIVISION

Dashboard PANCHAYAT AND RURAL DEVELOPMENT

Last fetched | updated on 2025-04-18 15:54:30

Start Date: 2025-03-12 10:00:00

End Date: 2025-04-23 05:30:00

Opening Date: 2025-04-25 06:00:00

Share

Re-Tender-RKI-Post supportive activities - Disinfection arrangements-Supply and Installation of dosing pump with accessories for chlorination and disinfection arrangements under Kayamkulam section] [WRD/KWA-CE(CR)/TR/9567/2023][2025_KWA_734690_1

Kerala Water Authority||Chief Engineer Central Region (Kochi)||Superintending Engineer (PH Circle Alappuzha)||Executive Engineer (PH Division Kayamkulam)||Asst Exec Eng (PH Sub Division Harippad)

Dashboard Kerala Water Authority

Last fetched | updated on 2025-04-18 15:43:21

Start Date: 2025-02-05 02:00:00

End Date: 2025-04-21 02:00:00

Opening Date: 2025-04-22 02:00:00

Share

State PlanConstruction of Retaining Wall at Adimaly Water Treatment Plant near Korangatti ] [29/24-25/EE/PHDN/TDPA][2025_KWA_734933_1

Kerala Water Authority||Chief Engineer Central Region (Kochi)||Superintending Engineer PH Circle Muvattupuzha||Executive Engineer (PH Division Thodupuzha)

Dashboard Kerala Water Authority

Last fetched | updated on 2025-04-18 15:43:15

Start Date: 2025-02-05 06:00:00

End Date: 2025-04-28 04:00:00

Opening Date: 2025-04-30 04:00:00

Share

107/2021-22/EE/PHDN/TDPA DUE DATE 24/12/2021 Stateplan 2023 24 Maintenance of Munnar IB Maintenance of Inspection Bungalow at Munnar construction of new Toilets to the IB Rooms IB Painting Separation of Store Room and Water Proofing of Section Offic] [28/24-25/EE/PHDN/TDPA][2025_KWA_735738_1

Kerala Water Authority||Chief Engineer Central Region (Kochi)||Superintending Engineer PH Circle Muvattupuzha||Executive Engineer (PH Division Thodupuzha)

Dashboard Kerala Water Authority

Last fetched | updated on 2025-04-18 15:43:09

Start Date: 2025-02-07 04:00:00

End Date: 2025-04-28 04:00:00

Opening Date: 2025-04-30 04:00:00

Share

O and M - WaterSupply Schemes - Annual Maintenance of RWSS to Arattupuzha 2024-25 - Leak Rectification Works in Pumping Main/ Distribution Lines under Arattupuzha Panchayath for the year 2024-25] [WRD/KWA-CE/TR/12726/2023-RE2][2025_KWA_735687_1

Kerala Water Authority||Chief Engineer Central Region (Kochi)||Superintending Engineer (PH Circle Alappuzha)||Executive Engineer (PH Division Kayamkulam)

Dashboard Kerala Water Authority

Last fetched | updated on 2025-04-18 15:43:03

Start Date: 2025-02-08 10:00:00

End Date: 2025-04-21 03:00:00

Opening Date: 2025-04-22 03:30:00

Share

JJM WSS to Sreemoolanagaram Kanjoor Chengamanad Nedumbasserry Parakkadavu panchayaths Production Components Package II] [Re-71/2024-25/SE/PHC/MVPA][2025_KWA_740204_1

Kerala Water Authority||Chief Engineer Central Region (Kochi)||Superintending Engineer PH Circle Muvattupuzha

Dashboard Kerala Water Authority

Last fetched | updated on 2025-04-18 15:42:46

Start Date: 2025-02-19 12:00:00

End Date: 2025-04-21 04:00:00

Opening Date: 2025-04-22 04:00:00

Share

JJM WSS to Sreemoolanagaram Kanjoor Chengamanad Nedumbasserry Parakkadavu panchayaths Production Components Package II] [Re-72/2024-25/SE/PHC/MVPA][2025_KWA_740285_1

Kerala Water Authority||Chief Engineer Central Region (Kochi)||Superintending Engineer PH Circle Muvattupuzha

Dashboard Kerala Water Authority

Last fetched | updated on 2025-04-18 15:42:39

Start Date: 2025-02-19 02:00:00

End Date: 2025-04-21 04:00:00

Opening Date: 2025-04-22 04:00:00

Share

Re75JJM- Phase II-RWSS to Paipra] [Re-75/2024-25/SE/PHC/MVPA][2025_KWA_740421_1

Kerala Water Authority||Chief Engineer Central Region (Kochi)||Superintending Engineer PH Circle Muvattupuzha

Dashboard Kerala Water Authority

Last fetched | updated on 2025-04-18 15:42:33

Start Date: 2025-02-19 04:30:00

End Date: 2025-04-21 04:00:00

Opening Date: 2025-04-22 04:00:00

Share

JJM-Phase II-RWSS to Paipra-Providing full coverage in Paipra Panchayath - Package -2- Laying clear water Pumping main at Thattuparambu] [Re-74/2024-25/SE/PHC/MVPA][2025_KWA_740553_1

Kerala Water Authority||Chief Engineer Central Region (Kochi)||Superintending Engineer PH Circle Muvattupuzha

Dashboard Kerala Water Authority

Last fetched | updated on 2025-04-18 15:42:26

Start Date: 2025-02-19 04:50:00

End Date: 2025-04-21 04:00:00

Opening Date: 2025-04-22 04:00:00

Share

STATE PLAN 2023-24-Mace of CWSS to Mala and adjoining Panchayaths Rehabilitation or improvement work of Urban water supply schemes CWSS to Mala and adjoining panchayaths and KMWSS to Kodugallur Muncipality - Replacing existing filter media -Filter] [38/EE/PHD/IJK/2024-25][2025_KWA_740255_1

Kerala Water Authority||Chief Engineer Central Region (Kochi)||Superintending Engineer PH Circle Thrissur||Executive Engineer (PH Division Irinjalakkuda)

Dashboard Kerala Water Authority

Last fetched | updated on 2025-04-18 15:42:20

Start Date: 2025-02-20 09:00:00

End Date: 2025-04-24 03:00:00

Opening Date: 2025-04-24 04:00:00

Share

Re79JJM-NELLIKUZHY PANCHAYATH--Package - I - Production components - Well cum Pump house WTP Row water pumping main-Pipeline Work] [Re-79/2024-25/SE/PHC/MVPA][2025_KWA_740592_1

Kerala Water Authority||Chief Engineer Central Region (Kochi)||Superintending Engineer PH Circle Muvattupuzha

Dashboard Kerala Water Authority

Last fetched | updated on 2025-04-18 15:42:14

Start Date: 2025-02-20 04:30:00

End Date: 2025-04-21 04:00:00

Opening Date: 2025-04-22 04:00:00

Share

FULL DEPOSIT SEMI TURNKEY BASIS DEFENCE CORRIDOR 05 NO WORK UNDER EDD MAURANIPUR ] [54/EDC/JHS/2024-25][2025_DVVNL_1014713_2

Dakshinanchal Vidyut Vitran Nigam Ltd.

Dashboard Dakshinanchal Vidyut Vitran Nigam Ltd.

Last fetched | updated on 2025-04-18 11:13:38

Start Date: 2025-03-21 02:00:00

End Date: 2025-04-23 12:00:00

Opening Date: 2025-04-23 03:00:00

Share

JJM WSS to Sreemoolanagaram Kanjoor Chengamanad Nedumbasserry Parakkadavu panchayaths Production Components Package II] [Re-81/2024-25/SE/PHC/MVPA][2025_KWA_741298_1

Kerala Water Authority||Chief Engineer Central Region (Kochi)||Superintending Engineer PH Circle Muvattupuzha

Dashboard Kerala Water Authority

Last fetched | updated on 2025-04-18 15:42:09

Start Date: 2025-02-21 01:00:00

End Date: 2025-04-21 04:00:00

Opening Date: 2025-04-22 04:00:00

Share

Laying of Clear Water Pumping Main from Chowara WTP to Chengamanadu OHSR and Construction of Chengamanadu OHSR] [Re-80/2024-25/SE/PHC/MVPA][2025_KWA_741513_1

Kerala Water Authority||Chief Engineer Central Region (Kochi)||Superintending Engineer PH Circle Muvattupuzha

Dashboard Kerala Water Authority

Last fetched | updated on 2025-04-18 15:42:03

Start Date: 2025-02-22 05:00:00

End Date: 2025-04-21 04:00:00

Opening Date: 2025-04-22 04:00:00

Share

O and M Water Supply Schemes Annual maintenance of RWSS to Kuttoor and NRDWP NC PC RWSS to Kuttoor Grama Panchayat for the year 2024 25 Pipeline work under Nedumpuram section] [RE Tender 41/2024-25/EE/PH/TVLA][2025_KWA_741944_1

Kerala Water Authority||Chief Engineer Southern Region (Trivandrum)||Superintending Engineer PH circle Pathanamthitta||Executive Engineer P H Division Thiruvalla

Dashboard Kerala Water Authority

Last fetched | updated on 2025-04-18 15:41:57

Start Date: 2025-02-24 10:00:00

End Date: 2025-04-25 01:00:00

Opening Date: 2025-04-26 02:00:00

Share

State Plan-2023-24-UWSS to Kothamangalam - Replacement of AC pipe lines and old aged PVC pipe line in Kothamangalam Municipality] [Re-83/2024-25/SE/PHC/MVPA][2025_KWA_742402_1

Kerala Water Authority||Chief Engineer Central Region (Kochi)||Superintending Engineer PH Circle Muvattupuzha

Dashboard Kerala Water Authority

Last fetched | updated on 2025-04-18 15:41:51

Start Date: 2025-02-24 01:00:00

End Date: 2025-04-21 04:00:00

Opening Date: 2025-04-22 04:00:00

Share

Re 77 JJM Well cum Pump house at Methipara and OHSR at Methipara WTP site] [Re-77/2024-25/SE/PHC/MVPA][2025_KWA_742199_1

Kerala Water Authority||Chief Engineer Central Region (Kochi)||Superintending Engineer PH Circle Muvattupuzha

Dashboard Kerala Water Authority

Last fetched | updated on 2025-04-18 15:41:44

Start Date: 2025-02-24 04:00:00

End Date: 2025-04-21 04:00:00

Opening Date: 2025-04-22 04:00:00

Share

Re 76 JJM Construction of 2LL Sump cum pump house and 4 LL OHSR at Ambaramala] [Re-76/2024-25/SE/PHC/MVPA][2025_KWA_743448_1

Kerala Water Authority||Chief Engineer Central Region (Kochi)||Superintending Engineer PH Circle Muvattupuzha

Dashboard Kerala Water Authority

Last fetched | updated on 2025-04-18 15:41:24

Start Date: 2025-02-27 11:00:00

End Date: 2025-04-21 04:00:00

Opening Date: 2025-04-22 04:00:00

Share

Re 78 JJM Pampakkuda Panchayath- Methipara] [Re-78/2024-25/SE/PHC/MVPA][2025_KWA_743456_1

Kerala Water Authority||Chief Engineer Central Region (Kochi)||Superintending Engineer PH Circle Muvattupuzha

Dashboard Kerala Water Authority

Last fetched | updated on 2025-04-17 16:42:22

Start Date: 2025-02-27 11:00:00

End Date: 2025-04-21 04:00:00

Opening Date: 2025-04-22 04:00:00

Share

State Plan-2023-24-UWSS to KothamangalamReplacement of AC Pipe Lines at Ambalaparambu - Valiyapara -Paraithottam road and Replacement of old aged Pumping Line to314 GL Tank and distribution line from 314 GL Tank] [Re-82/2024-25/SE/PHC/MVPA][2025_KWA_743600_1

Kerala Water Authority||Chief Engineer Central Region (Kochi)||Superintending Engineer PH Circle Muvattupuzha

Dashboard Kerala Water Authority

Last fetched | updated on 2025-04-18 15:41:18

Start Date: 2025-02-27 01:00:00

End Date: 2025-04-21 04:00:00

Opening Date: 2025-04-22 04:00:00

Share

Start Date: 2025-02-27 05:00:00

End Date: 2025-04-25 03:00:00

Opening Date: 2025-04-26 03:30:00

Share

State Plan 2023 2024 Energy efficiency improvement Optimisation of electromechanical items Safety audit and ensuring safety in operation ofPumphouses 4215 01 800 Supply Erectionand Commissioning of Electrically operated brand new Horizontal ] [2nd RE E Tender 35/2024-25/EE/PH/TVLA][2025_KWA_744044_1

Kerala Water Authority||Chief Engineer Southern Region (Trivandrum)||Superintending Engineer PH circle Pathanamthitta||Executive Engineer P H Division Thiruvalla

Dashboard Kerala Water Authority

Last fetched | updated on 2025-04-17 16:41:41

Start Date: 2025-02-28 01:00:00

End Date: 2025-04-25 01:00:00

Opening Date: 2025-04-26 02:00:00

Share

Const. of Boundary Wall Under Project Alankar at GOVT GIRLS HIGH SCHOOL HASANPUR KATAULI Lakhimpur Kheri] [05 / NIVIDA / 02 Dated 03/ 01/2025 ][2025_UPCDS_992052_1

Construction and Design Services UP Jal Nigam||C.G.M. (HQ)||G.M. (HQ)||P.M. (HQ)

Dashboard Construction and Design Services UP Jal Nigam

Last fetched | updated on 2025-04-18 11:03:02

Start Date: 2025-01-10 09:00:00

End Date: 2025-04-25 11:00:00

Opening Date: 2025-04-25 05:00:00

Share

AMRUT Providing Scour Line Isolating the Existing Line and Extension of Pipeline Inter connection work at Various Locations around Kuttanellur OHSR Tank GENERAL CIVIL WORKS] [40/EE/PHD/IJK/2024-25][2025_KWA_744039_1

Kerala Water Authority||Chief Engineer Central Region (Kochi)||Superintending Engineer PH Circle Thrissur||Executive Engineer (PH Division Irinjalakkuda)

Dashboard Kerala Water Authority

Last fetched | updated on 2025-04-18 15:41:01

Start Date: 2025-02-28 01:00:00

End Date: 2025-04-24 03:00:00

Opening Date: 2025-04-24 04:00:00

Share

Const. of Boundary Wall Under Project Alankar at Govt Girls Inter College PHOOLBEHAR,Lakhimpur Kheri] [05 / NIVIDA / 02 Dated 03/ 01/2025][2025_UPCDS_992060_1

Construction and Design Services UP Jal Nigam||C.G.M. (HQ)||G.M. (HQ)||P.M. (HQ)

Dashboard Construction and Design Services UP Jal Nigam

Last fetched | updated on 2025-04-18 11:02:40

Start Date: 2025-01-10 11:00:00

End Date: 2025-04-25 11:00:00

Opening Date: 2025-04-25 05:00:00

Share

State Plan-2024-25 - Providing separate toilet, restroom and incineration unit for woman in all offices of the CE(CR) office building] [WRD/KWA-CE(CR)/TR/8811/2024][2025_KWA_744202_1

Kerala Water Authority||Chief Engineer Central Region (Kochi)||Superintending Engineer PH Circle Kochi||Executive Engineer (PH Division Kochi)||AEE Sewerage Subdivision, Kochi

Dashboard Kerala Water Authority

Last fetched | updated on 2025-04-18 15:40:55

Start Date: 2025-02-28 03:00:00

End Date: 2025-04-22 02:00:00

Opening Date: 2025-04-23 02:30:00

Share

PVC Copper Cable Single Core and Multi Core Circular Sheathed Cord with Flexible Conductor (V2) as

Ministry of Defence Department of Military Affairs

Dashboard Ministry of Defence Department of Military Affairs

Start Date: 2025-03-17 03:19:00

End Date: 2025-04-23 09:00:00

Opening Date:

Share