Showing 78871 to 78900 of 80523 results
[Maintenance Contract on Mihona-Lahar-Daboh Length 26.62 km on NH-552 Ext. in the state of Madhya Pradesh on Performance Based Maintenance Contract PBMC mode] [04/SAC/TENDER/NH/GWL/2024-25][2024_MoRTH_829453_1]
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhopal - MoRTH||NH Madhya Pradesh PWD-NH-Section-BHOPAL - MoRTH
Last fetched | updated on 2024-11-24 15:32:04
Start Date: 2024-10-07 10:30:00
End Date: 2024-12-02 05:30:00
Opening Date: 2024-12-04 12:30:00
Share
[Short Term Maintenance Contract (STMC) work from Km 11/2 to Km 13/6 of National Highway-86 Ext. of length 2.4 km in state of Madhya Pradesh.] [06/SAC/Tender/NH/BPL/2024-25][2024_MoRTH_829479_1]
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhopal - MoRTH||NH Division-Bhopal - MoRTH
Last fetched | updated on 2024-11-24 15:31:46
Start Date: 2024-10-07 05:30:00
End Date: 2024-11-28 05:30:00
Opening Date: 2024-12-02 05:30:00
Share
[ Rehabilitation and Up-gradation for Yedshi-Latur road Section of stretch, NH- 63, starting from Ch. 24-350 to Ch. 61-875 Km (Length-37.525 Km) to 4LPS in the State of Maharashtra on EPC Mode.] [RO/MUM/TENDER/2024-25/02][2024_MoRTH_829621_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH
Last fetched | updated on 2024-11-24 15:31:37
Start Date: 2024-10-07 06:30:00
End Date: 2024-12-13 05:00:00
Opening Date: 2024-12-16 11:00:00
Share
DSITC 1 Ton per Day Bio Diesel Plant at HPCL Vashi Tml,DSITC 1 Ton per Day Bio Diesel Plant at HPCL
Ministry of Petroleum and Natural Gas NA
[Widening to 2 Lane from Existing Chainage Km 74.700 to Km 100.660 (Design Chainage Km 53.365 to Km 78.785) on NH 507 in the state Uttarakhand] [4232/13Yata-NH-10/2024 dt. 04.10.2024][2024_MoRTH_829650_1]
Ministry of Road Transport and Highways||P1 Delhi - MoRTH||RO Dehradun - MoRTH||NH Uttarakhand PWD-NH-Section-Dehradun - MoRTH
Last fetched | updated on 2024-11-24 15:31:11
Start Date: 2024-10-07 06:55:00
End Date: 2024-12-26 12:00:00
Opening Date: 2024-12-27 03:00:00
Share
[Maintenance of Rehabilitaion and upgradation of Latur to Pangaon km 64.250 to 85.680 NH 548B and Renapur phata to Kharola km 86.055 to 92.040 of NH 361H to 2L PS 4L in the state of Maharashtra under Performance Based Maintenance Contract.] [NIT No. 13/EENHD/Latur/PBMC/1572/2024][2024_MoRTH_829559_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Aurangabad - MoRTH
Last fetched | updated on 2024-11-24 15:29:20
Start Date: 2024-10-08 10:00:00
End Date: 2024-12-20 05:30:00
Opening Date: 2024-12-23 11:00:00
Share
[Strengthening of NH 166A to two lane paved shoulder from Km 0.000 to Km 22.200 of Vadhkal Alibag road for design length 22.200 Km in Raigad district in the State of Maharashtra on EPC Mode] [No.NHD/PEN/AB/TC/2211 /2024-25/Dated 04.10.2024][2024_MoRTH_829661_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Pen - MoRTH
Last fetched | updated on 2024-11-24 15:29:36
Start Date: 2024-10-08 10:00:00
End Date: 2024-12-16 05:00:00
Opening Date: 2024-12-18 11:00:00
Share
[Maintenance of Upgradation of Omerga to Ausa of NH 548B from km249.200 to 201.400 to 2L PS Design Ch. 0.00 tp 47.800 in the state of Maharashtra under Performance Based Maintenance Contract.] [NIT No. 13/EENHD/Latur/PBMC/1572/2024][2024_MoRTH_829508_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Aurangabad - MoRTH
Last fetched | updated on 2024-11-23 14:43:20
Start Date: 2024-10-08 10:00:00
End Date: 2024-12-20 05:30:00
Opening Date: 2024-12-23 11:00:00
Share
[RFP for Construction of Historical Murals Sculpture of various memorable events of Dr. Babasaheb Ambedkar in the section of available ROW And Realignment portion of NH 965DD Mandangad Pachral Ambadave in the state of Maharashtra on EPC mode] [No.NHD/PEN/AB/TC/2213/Dated 04.10.2024][2024_MoRTH_829663_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Pen - MoRTH
Last fetched | updated on 2024-11-24 15:30:05
Start Date: 2024-10-08 10:00:00
End Date: 2024-12-16 05:00:00
Opening Date: 2024-12-18 11:00:00
Share
[Construction of Major Bridges Flyover VUP Culverts Retaining and Toe Wall from km 0.000 to km 22.200 of Vadhkal Alibag road for design length 3.770 Km in Raigad district in the State of Maharashtra on EPC Mode] [No.NHD/PEN/AB/TC/2212 /2024-25/Dated 04.10.2024][2024_MoRTH_829662_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Pen - MoRTH
Last fetched | updated on 2024-11-24 15:29:45
Start Date: 2024-10-08 10:00:00
End Date: 2024-12-16 05:00:00
Opening Date: 2024-12-18 11:00:00
Share
[Construction of Bhugaon Realignment road ch. 0.000 to ch. 0.860 Four lane along with National Highway 753F Design length 0.860 kms. in village Bhugaon Tal. Mulshi in the State of Maharashtra under EPC Mode] [No.06/EENH/PUNE/2783/2024 dt.07/10/2024][2024_MoRTH_829669_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Pune - MoRTH
Last fetched | updated on 2024-11-24 15:29:11
Start Date: 2024-10-08 11:05:00
End Date: 2025-01-06 05:00:00
Opening Date: 2025-01-07 05:05:00
Share
[Perfomance Based Maintenance Contract for Rajgarh-Pilani-upto Haryana Border Road of NH-709extn. from Chainage km 3.650 to km 58.325] [NIT No. 10/2024-25 SE NH BIKANER][2024_MoRTH_829665_1]
Ministry of Road Transport and Highways||P4 Delhi - MoRTH||RO Jaipur - MoRTH
Last fetched | updated on 2024-11-24 15:28:37
Start Date: 2024-10-08 12:00:00
End Date: 2024-12-03 11:00:00
Opening Date: 2024-12-04 01:00:00
Share
[Consultancy Services for preparation of Detailed Engineering report for Widening from two lane paved shoulder to four lane paved shoulder from Km 0.00 State boarder of Rajasthan AND Gujrat to 76.400 (Junction of NH62 in Sirohi Via Mandar Reodar AND A] [NIT NO 02/2024-25 SE NH JODHPUR][2024_MoRTH_829302_1]
Ministry of Road Transport and Highways||P4 Delhi - MoRTH||RO Jaipur - MoRTH
Last fetched | updated on 2024-11-24 15:28:23
Start Date: 2024-10-08 12:10:00
End Date: 2024-11-25 11:00:00
Opening Date: 2024-11-26 01:00:00
Share
[ Reconstruction and Up-gradation to 2LPS for the work of Junnar - Ghodegaon - Taleghar Road (NH-61 Spur) from km 13-880 to km 69-820 (Design length - 55.940 Km) in the state of Maharashtra on HAM.] [RO/MUM/TENDER/2024-24/04][2024_MoRTH_829893_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH
Last fetched | updated on 2024-11-24 15:27:51
Start Date: 2024-10-08 06:55:00
End Date: 2024-12-13 05:00:00
Opening Date: 2024-12-16 11:00:00
Share
[Widening, Reconstruction and Up-gradation to 2PLS configuration for the work of Bhimashankar-Taleghar- Wada- Rajgurunagar the State of Maharashtra on HAM.] [RO/MUM/TENDER/2022-25/03][2024_MoRTH_829881_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH
Last fetched | updated on 2024-11-24 15:28:13
Start Date: 2024-10-08 06:55:00
End Date: 2024-12-13 05:00:00
Opening Date: 2024-12-16 11:00:00
Share
[Performance based Maintenance Contracts (PBMC) Estimate of Chikhli to Takarkhed Bhagile section from km 68/900 to km 108/500 of NH 753A total project length 39.60 km having 4 lane with paved shoulder in the State of Maharashtra for 5 year Maintenance] [07/EENH/AKL/2024-25, Dt.08/10/2024][2024_MoRTH_829907_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Akola - MoRTH
Last fetched | updated on 2024-11-24 15:27:26
Start Date: 2024-10-09 09:00:00
End Date: 2024-12-10 05:30:00
Opening Date: 2024-12-12 03:30:00
Share
[Performance Based Maintenance Contract (PBMC) work on Malegaon Risod road Section of NH 461B (km0.00 to 36.845) Length 36.845 Km Two lane with paved shoulder configuration section of NH 461B in the State of Maharashtra for 5 year Maintenance period] [09/EENH/AKL/2024-25 Dt.08.10.2024][2024_MoRTH_829917_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Akola - MoRTH
Last fetched | updated on 2024-11-23 14:42:21
Start Date: 2024-10-09 09:00:00
End Date: 2024-12-10 05:30:00
Opening Date: 2024-12-12 03:30:00
Share
[Performance Based Maintenance Contract of Rehabiliatioan and upgradation of kherda nagzari NH161E (km 77.134 to 10.367) to two four lane with paved shoulders configuration for 5 years maintenance period in the state of maharashtra] [12/EENH/AMT/2024-25 Dt.09.10.2024][2024_MoRTH_829920_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Nagpur - MoRTH
Last fetched | updated on 2024-11-24 15:25:50
Start Date: 2024-10-09 09:00:00
End Date: 2024-12-06 05:30:00
Opening Date: 2024-12-09 12:00:00
Share
[PBMC of R U Kalamb Ralegaon Wadki NH361B km0.00 to 50.275 km 50.275 to two lane with paved shoulders configuration for 5 year aintenance period in the state of mahsrashtra] [13/EENH/AMT/2024-25, Dt.09/10/2024][2024_MoRTH_829921_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Nagpur - MoRTH
Last fetched | updated on 2024-11-23 14:41:38
Start Date: 2024-10-09 09:00:00
End Date: 2024-12-06 05:30:00
Opening Date: 2024-12-09 12:00:00
Share
[PBMC estimate of Morshi Chandurbazar Achalpur section km0.00 to 53.719 of NH353J length 42.594 having two lane with paved shoulders 4 lane in the state of maharashtra] [14/EENH/AMT/2024-25, Dt.09/10/2024][2024_MoRTH_829922_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Nagpur - MoRTH
Last fetched | updated on 2024-11-24 15:25:41
Start Date: 2024-10-09 09:00:00
End Date: 2024-12-06 05:30:00
Opening Date: 2024-12-09 12:00:00
Share
[PBMC estimate of Nandgaonpeth Morshi Warud MH MP border section form km0.00 to95.390 of NH353K length 88.291 km having two lane with paved shoulders 4 lane in the state of maharashtra for 5 year maintenance period] [15/EENH/AMT/2024-25, Dt.09/10/2024][2024_MoRTH_829923_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Nagpur - MoRTH
Last fetched | updated on 2024-11-24 15:26:00
Start Date: 2024-10-09 09:00:00
End Date: 2024-12-06 05:30:00
Opening Date: 2024-12-09 12:00:00
Share
[Consultancy services for preparation of Detailed Project report for the work Construction of 4L from km 182.300 to km 202.200 Bhawanipatna to Junagarh of NH 26 in the State of Odisha.] [07-ROBBSR-2024-25/DPR][2024_MoRTH_829882_1]
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhubaneswar - MoRTH
Last fetched | updated on 2024-11-24 15:25:32
Start Date: 2024-10-09 01:00:00
End Date: 2024-11-27 12:00:00
Opening Date: 2024-11-28 12:30:00
Share
[Consultancy services for preparation of Detailed Project report for the work Construction of 4L from km 145.00 to km 171.800 kesinga to Bhawanipatna.] [06-ROBBSR-2024-25/DPR][2024_MoRTH_829873_1]
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhubaneswar - MoRTH
Last fetched | updated on 2024-11-24 15:25:22
Start Date: 2024-10-09 02:00:00
End Date: 2024-11-27 12:00:00
Opening Date: 2024-11-28 12:30:00
Share
[PBMC Estimate OF length other than LA affected stretches for Jalgaon Pachora Bhadgaon Chalisgaon. Section I of NH753 J Km.04.000 to 56.200 Jalgaon to Bhadgaon in the State of Maharashtra for 5 year Maintenance Period] [NIT/03/EENH/Dhule/815/2024 dt.09.10/.2024][2024_MoRTH_830125_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharastra PWD - Dhule - MoRTH
Last fetched | updated on 2024-11-24 15:25:12
Start Date: 2024-10-09 06:15:00
End Date: 2024-12-10 05:30:00
Opening Date: 2024-12-13 01:00:00
Share
[PBMC Estimate OF length other than LA affected stretches for Jalgaon Pachora Bhadgaon Chalisgaon. Section II of NH753 J Km.56.200 to Km 103.000 Bhadgaon to Chalisgaon in the State of Maharashtra for 5 year Maintenance Period] [NIT/03/EENH/Dhule/815/2024 dt.09/10/2024][2024_MoRTH_830149_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharastra PWD - Dhule - MoRTH
Last fetched | updated on 2024-11-24 15:25:02
Start Date: 2024-10-09 06:40:00
End Date: 2024-12-10 05:30:00
Opening Date: 2024-12-13 01:00:00
Share
[Construction of Bypass Road to Phulbani town from km. 29.800 (Design ch. 0.0) to km. 39.000 (Design ch. 7.250 ) of NH-157 in the state of Odisha on EPC Mode] [08 CE NH of 2024-25][2024_MoRTH_829943_1]
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhubaneswar - MoRTH||NH Odisha PWD-Kesinga - MoRTH
Last fetched | updated on 2024-11-24 15:24:42
Start Date: 2024-10-09 06:55:00
End Date: 2024-12-23 12:00:00
Opening Date: 2024-12-30 03:30:00
Share
[RCC drain Black Toping at Sirasdevi Ratanapur Village in Km 334 00 Gadi to Km 434 00 Manvat and Reconstruction of canal Bridge Sawargaon Km 387 700 on NH61 in the state of Maharashtra] [EENHD/Chh.S./Tender/NIT No-9/3002220][2024_MoRTH_829915_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Aurangabad - MoRTH
Last fetched | updated on 2024-11-24 15:24:23
Start Date: 2024-10-10 09:00:00
End Date: 2024-12-05 05:30:00
Opening Date: 2024-12-06 12:00:00
Share
[Construction of 4 Lane with Paved shoulders Bypass to Nalgonda Town from design km 0.000 to km 14.000 length 14.00km Existing Ch km 18 710 to 28 685 of Nakrekal to Nagarjuna Sagar section of NH 565 in the State of Telangana on EPC Mode under Annual ] [SE R and B NH HYD 08 2024 25 Dt. 09.10.2024][2024_MoRTH_830158_1]
Ministry of Road Transport and Highways||P7 Delh - MoRTH||RO Hyderabad - MoRTH||NH Division-Hyderabad - MoRTH
Last fetched | updated on 2024-11-24 15:24:32
Start Date: 2024-10-10 09:00:00
End Date: 2024-12-10 03:00:00
Opening Date: 2024-12-11 03:00:00
Share
[Construction on Major Bridge on Bori River at Ch.98.020 along with approaches from Km 97.600 to Km 98.350 Total Length of the project 0.750 km on Akkalkot Gangapur] [NHD/TC/EPC/2716/2024][2024_MoRTH_830213_1]
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-SOLAPUR - MoRTH
Last fetched | updated on 2024-11-24 15:24:00
Start Date: 2024-10-10 03:00:00
End Date: 2024-12-02 05:30:00
Opening Date: 2024-12-04 03:00:00
Share
[Independent Engineer services for Improvement and up-gradation in 2 lane with PS configuration of newly declared NH-227B Bahuvan Madar Majha to Jagarnathpur(Design Km 160.200 to Km 224.040) 84 Kosi Parikrama Marg in the State of UP on HAM PackageVI.] [CE-RO/LKO/NH(O)/25/NH-227B(Pkg VI)2022-23/IE Dated.10.10.2024][2024_MoRTH_830212_1]
Ministry of Road Transport and Highways||P2 Delhi - MoRTH||RO Lucknow - MoRTH
Last fetched | updated on 2024-11-24 15:23:42
Start Date: 2024-10-10 05:00:00
End Date: 2024-12-26 11:00:00
Opening Date: 2024-12-27 12:30:00
Share